Skip to main content
Return to Citizen Homepage
Incident location
Hazardous Condition
2Videos
43Radio Clips
1.0KReactions

Six Hurt in Collapse at Construction Site

1490 NW 3rd Ave

Published · Updated

Archived

Watch Live Videos

Download Citizen
Video 1
Video 2

Summary

  • A construction site collapse involving a work bridge in Miami resulted in six individuals being transported for medical treatment. Rescue teams successfully freed a trapped person and coordinated with multiple agencies to manage the scene and ensure the safety of the unstable structure.

Timeline

All construction workers are being brought out as rescue operations wind down.

Miami FR Tac K · 0:19
Chieftothecommand,we'rebringingalltheconstructionworkersout.Rescueusup,I'mgoingtostartwithunits.Command2,area1.Area1,K.Area1,takearun.10-34.

All workers are accounted for, and operations are being shut down at the construction site.

Miami FR Tac K · 0:31
Command,we'vecountedforallworkers.We'reabouttogotozeromechanicalstateandshutdowneverything.QSL.Everyoneisonit.Okay.Let'smakesurewetakethatarea,makesurenooneiswatchingthatarea.I'mgoingtohavecontact,EFD,seeiftheyshutthatroaddownoratleastthatlane.QSL,ifwecanidentify,10-4,wecanalwaysputaunitthereinablockofahighway.

Radio clips available.

Miami FR Tac K · 0:30
Command2,Chief2.Chief2tocommand.Hey,itlookslikethe,uh,thatthingwantstotoppleover.It'sjustbeingheldupbythearmoftheconcretepump.Iwanttogetoutofthatarea.Chief2tocommand,we'regoingtohavetoshutdownthatsectionofroadwaythatrunsalongthealso.ItshouldbeinfrontoftheborderoftheColossal.QSL?QSL.

Rescue teams confirm no additional patient transport is needed at the construction site.

Miami FR Tac K · 0:16
Rescue2,putmetocommand.QSL,QSL.We'regoing09fromRiderTravel.Doyouneedanymorepatientstransported?Negative,we'regood.Thankyou.QSL.

Evacuation of the area is underway as the concrete bunk is the only support holding the form.

Miami FR Tac K · 0:15
Key3toKey3,youwantDREevacuated?That'sQSL.Let'sstartevacuatingeverybodyout.Theonlythingholdingaformrightnowwethinkistheconcretebunk.

The final victim is on a stretcher, and teams are confirming with the foreman that no one is missing.

Miami FR Tac K · 0:31
Rescue9tocommand,youwantustoheadovertherewithastretcherjustincase?Chief2tocommand.QSL,Rescue9,makeitover.Goahead,Chief2.Wehavethefinalvictimonthestretcherheadingdown.We'rejusttryingtogetaheadcountfromtheforemantomakesurethatwe'renotmissinganybodyinthefloor.We'regoingtogoaheadandevacuatetheareaaswell.Thankyou,I'llgoaheadandevacuateandseeifwegetabuildingfromtheairport.Makesurewehavecontact.QSL.

Rescue teams confirm six patients have been transported from the construction site.

Miami FR Dispatch · 0:10
Beadvised,atotalofsixpatientshavebeentransported,totalofsix.Totalofsixtosevenpatients?

Rescue teams confirm all patients accounted for and are coordinating further actions on 16th Street and 3rd Avenue.

Miami FR Tac K · 0:19
unitscommand,wearearrivalon16thStreetand3rdAve.QSL,10-9.JustPRus,wegotallourpatients,letmeconfirm.You'reenroutefornow.QSL.

Rescue teams are coordinating with Chief 1 to confirm the number of patients at the site.

Miami FR Dispatch · 0:12
Youcangoaheadandset07Rescue12,07Rescue12.QSL,Chief1,07Rescue12.Chief1,approximatelyhowmanypatientsdoyouhave?

A rescue unit is transporting a trauma patient from the construction site.

Miami FR Dispatch · 0:10
MiamiRescue22,transportingridertrauma.10-4,Rescue22,transportingridertrauma,2241,ma'am.Chief1,ma'am.Chief1,QSK.

Rescue teams have freed the trapped individual and are preparing to place him on a stretcher for evacuation.

Miami FR Tac K · 0:19
Chief2tocommand.Command,goahead.We'vegotthegentlemanoutoftheform.We'reattemptingtobringhimdownnowandthenwe'rejustgoingtoevacuatethisareaandcorditoff.QSL,they'regettingreadytobringitdownandtrytogethimonthestretcher.QSL?QSL,yougotastretcherthatway?

Rescue teams have freed the trapped individual and are preparing to clear the area.

Miami PD Central Ch 3 · 0:31
42,4130.arusticvehicleandfollowthoserescuetrucks,please.Gotit.justtomakewayforfirerescueat2240.4130.130,go.QSL,justtoverifyifyouwerealsoonthesceneon315.Roger.QSK.QSK.Unit,whathappened?2143,Igotthelastrescuehere.We'renowatrestnumber5.Uh,it'sageneration.There'sonemoreindividualringthat'sstuckupintheatthecar.QSL,324.QSL.

Rescue teams have successfully freed the trapped individual and are preparing to evacuate the area.

Two rescue units are on scene, preparing to transport patients from the construction site.

Miami PD Central Ch 3 · 0:24
DF4,13.4390,they'recurrentlyrespondingjustareferencetoWestBunksideandthey'restilltryingtogetanATAnow.Police,thankyou.That'sQSL,2239.423.423.AlrightMiami,wegottworescueunitsrightnow,Rescue23andRescue2.Regardstoalltheunitsinthearea,10-8.QSL,canyoustarttellingwhereyouare?I'mprettysurethey'reallgoingtobetrauma,regardlessoftheconditions.QSL,thisis2220.
Miami FR Tac K · 0:22
We're,uh,cleartohavein16thStreet.Phone1,nozzletocommand,beadvised,transportingwithrescue2to,we'llletthecleargo.29,Ineedyou,pleasemakeyourwayoverhereto,uh,15thand15thStreet.Thisisalittleincident,alright,ifyoucancomefromthenorthside,comefromthesouth,Ineedyoucloser.You'regoingtobemynexttransportunit,clear.

Authorities are coordinating with highway patrol to manage traffic on 395 during the ongoing rescue efforts.

Miami PD Central Ch 3 · 0:13
And95.95.Whenyoucan,givemethestatusofFHPonthe395.Iftheycanatleasttheandweshutitdownwhilethey'reworkingonthispieceofit,seeifthey'llseecars.We'reat,uh,cleartohavein16thStreet.

Two more rescue units are being dispatched to the construction site for assistance.

Miami FR Dispatch · 0:10
Miami,Iaskedforthreeadditionalrescuesandyouonlysentmeoneadditionalone.Goaheadandsendmetwomore,please.QSL,twomoreadditionalrescues.2238Miami.

Rescue teams are staging with fire rescue to load patients and prepare for transport.

Miami PD Central Ch 3 · 0:20
2390.Yes,sir?Wecheckedforbutnoresponse.Appreciateyou.124isgoingtobestagingwithfirerescuewherethey'reloadingupthepatients.Andassoonastheystartex-failandleaving,he'sgoingtoannounceitsowecanassignunitstothoserescuetrucks,please.That'sclear,2238.

14th Street is being closed to assist with rescue operations at the construction site.

Miami PD Central Ch 3 · 0:30
7603.7603.Iwant14thStreetshutdownaswell.Beadvised,14thStreet,eastoftheWest.Alright,Iwantitshutdown.That'sQSK,wecurrentlyhaveourunitsstuckandthey'regoingtobeholding3and13now,QSL.ifyoucan,let'scrossdispatchanybodyfromtheeast.Theycan,I'mgoingtoneedonetoshut14overon,let'smakeit1stAvenueandthenanotheroneon7thAvenue.Nothingcomes.

A rescue unit has arrived on the north side, and a stretcher is being requested.

Miami FR Tac K · 0:22
25,youcanshowusarrivalonthenorthside.Doweneedabackboardorjustastretcher?That'sQSL.Youguyscopythat?Doyouwantabackboardtooorjustastretcher?Justastretcher,justastretcher.23isarriving,stagingonNorthwest3rdAveand14th.Whatdoweneed?7603,we'reenroute.

Rescue teams are preparing to evacuate the area after moving one more victim from the site.

Miami FR Tac K · 0:30
Command2toarea1.2SO.Area1,K.Ijustgotanewvehicleinthewaitinghouse,youguysareblockingthemoutoftheway.2OSo,sendyourdrivernow.Chieftothecommand.CommandK.Wegotonemorevictimwho'sabouttocalloutZoom.We'regoingtogoaheadandmovethemout.Thenwe'lljustseeTRTuphere.We'regoingtotrytoextricateonefromtheformandthenwecanevacuatethewholearea.3Sir,yousaidyougotonenow,yougotonemorecat?Yeah,Ithinkyou'regoingtoevacuatethewholearea.Copy.

Rescue teams are assessing the leaning structure, which appears to have fallen off a pillar.

Miami PD Central Ch 3 · 0:31
Ma'am,sorry,didyouread?Ihaveeverybodymeetattheirfirstchoice.FromtheThat'sQSL,justadvisingallunitscheckingthepressure,it'sgoingtobea43andat2234.10-4,QSL.QA.QSL,canyouadviseeastandwestreferenceto394?Whichisclosesttodistrict'sHP?Rightnow,we'relookingatthewestboundtraffic,buthavethemassessbecausethewaythisstructureisleaning,itlookslikeitfelloffoneofthepillarsandit'sactuallyleaning.So,whatit'sgoingtodoorwhatit'sgoingtodois...

Another stretcher is being brought up the ramp, and an additional rescue unit is arriving from the north side.

Miami FR Tac K · 0:31
Engine2tocommand,dowehaveanotherstretchercominguptheramphere?Engine5,goaheadwithcommand,wehaveanotherstretchercomingup.909,rescue22.Chief3toChief1.Hey.Chief,I'mbeingadvisedbyEMS1thatwe'regoingtoneedonemorerescue.Yes,sir.Youshouldbegettingrescue25inaminute.Thereshouldbeafromthenorthside.Engine2,I'mgettingarescue.Yeah.

Traffic is being blocked east and west on 395 to ensure safety around the unstable structure.

Miami PD Central Ch 3 · 0:26
4220.4220.We'regoingtohavetoblock,um,EastandWeston395.Wedon'tknowaboutthestructure.It'sstraightLondon.Andit's,uh,itcanmakeit22the8thtoMetro.That'sclear.We'llgetthemtheinnercitynow,22-32.That'sgoingtobebetweenFoxandthe3,like35.That'sclear,sir.We'lladvisethemnowat22-32.

Rescue teams are setting up lights to assist with the ongoing operation at the construction site.

Miami FR Tac K · 0:28
CommandtoChief2.TRTcommand,we'regoingtobemovingallthepeopleoutofthecallroomexceptforTRT.Wehaveonepersontrappedupintheforum.We'llbemovingthatonein.That'sQSL,IcanmoveeverybodyoutexceptforTRT.Youwantmetosetupsomelightsoverthere?Youguysgoodwithlights?14,youhavealighttoshoot?That'sQSL,letmeknowwhatelseyouguysneed.Igotmorerescuegoing.

Rescue teams are preparing to stabilize the bridge structure at the construction site.

Miami PD Central Ch 3 · 0:15
You'regoingtohavetogivemealittlebitonthatone,please.LetmeknowassoonasIcan.QSL,doyouhavethesuper-barrelforthebridge?1725.QSL.Justgiveusaminuteandwe'llgoaheadandO2thebridge.Justgiveusaminute.QSL,thankyou.

Two additional backboards are being sent to assist with rescue efforts at the site.

Miami FR Tac K · 0:14
Hazmat1toanyrescuedownbelow,canwegetonemorebackboard?Rescue1toMiami,we'rebringingyouguystoHazmat.We'vegottwobackboardsontheway.QSL.

Units are clearing vehicles from 3rd Avenue to allow fire rescue operations to proceed.

Vehicles are being moved to clear the way for fire rescue operations on 3rd Avenue.

Miami PD Central Ch 3 · 0:29
AndIneedtwounitsonstandbyassoonastherescuestartsgoingtofollowrescuetoJackson.That'sclear.Justforyourunits,justtosayonthe3rdAvenuesideuntilfurtherinstructedfor2390.Justtosaythat,justtosayonthe3rdAvenuesideuntilfurtherinstructed,1349.Anyunitsthatcanfollowforfirerescue?Vehicleson3rdAvenuebetween14thStreetand15thStreet,youneedtomoveyourvehicle.Firerescueneedstobedoneonthevehicle.Yes,sounitsthatcanbebetween3rdAvenueand14thand15th,justtomoveyourvehicleforfirerescue.3rdAvenueand14thand15th,justtomoveyourvehiclesat2329.

Rescue teams request a backboard for a person with a broken arm at the site.

Miami FR Tac K · 0:07
Weneedabackboard,wegotaoverherewithabrokenarmandanothertree.CSO,anythreemore?

Rescue teams are stabilizing one person and working on two others. Additional units are waiting for instructions nearby.

Miami PD Central Ch 3 · 0:30
4234.4234.Uh,intersection5,youcanshow4234and4233onit.9QSL.What'sthechange,20inthehouse,263.90.10-K.They'reputtingonedown,uh,they'rerampoverheretowardsthestreet.Andthey'retryingto,uh,they'reworkingontheothertworightnow.Twounits.Wedon'tneedanymoreunitscomingoverheretowardsthething.Havethemwaitinthestreeton3rdAvenueforfurtherinstructions.Yeah.

Rescue teams confirm one person remains trapped, and additional rescue units are being requested for assistance.

Miami FR Tac K · 0:31
Man,beadvised,thispersonthatkilledus,itdoesn'tmakethatstable.Thegentlemanistrapped,andwehaveoneperson,onepatientthat'sstillsomewhatunderthepossiblefactszone.QSL,you'resayingyougotatleastonepatienttrappedandit'sastable?Rightnow,IgotRescue22andRescue2andRescue5ontheirwaytoyoutogetthepatientthatnowtrapped.QSL?QSL,we'regoingtoneedafourthandafifthrescue.QSL.

Rescue teams are coordinating medical transfers and assessing the situation for safe extrication at the site.

Miami FR Tac K · 0:31
2Rescue22andRescue5.Youguyswillbethemedicaltransferrightnow,makingwaytotheincidentandwecantrytoreceivethepatients.Phone1,command,we'rearrival.Youneedmetogoupthereandassesswhatweneedforextrication?10-4,I'mmakingmywayupthere,assessthesituation,seewhatweneedtodotogetsafetyintheretoassist.Homesback1,we'reontherun,butwe'lljoinphone1andseewhatthesituationisthere.10-4,Iread1.Thankyou.

Additional rescue units are on the move to assist at the construction site collapse.

Miami FR Tac K · 0:30
QSW,startassessingandseewhatweneed.Inthemeantime,Command2,Rescue22,Rescue5,andnextincomingrescue,you'llbethemedicalunitstomakeyourwaytothescene.Command2,Rescue22,youcopythat?QSL,we'regettingwayoffinsearchesandequipment.QSL,Rescue22and2.Command2,Rescue5.QSL,Rescue5,we'reonthemove.QSL,Rescue5,we'reonthemove.

Rescue teams report one person trapped on the east side of the collapse, with three trauma alerts issued.

Miami PD Central Ch 3 · 0:30
Igotthat,uh,medicout.QSL.QSL,4133,I'llshowyouenroutetothe22.4390,canyourescueaCP?RescueaCP,Eastboundon14thStreetforasecond.Makesurewegetthenumbertoargue.4390.90,everybody'shere.Justmeandwasattemptingtoevict.CPwillputitrightnowfor314untiloursergeantarrives.I'mhearingtheinterior.QSL,showtheCPfor314nowandtryto225.Justre-advancingourunitstotakecaution.It'sgoingtobeonit.Justre-advancingforthepublic.73.
Miami FR Tac K · 0:31
There'sa,itlookslikehe'stalking.He'strappedupontheeastsidecollapse.That'sQSLEngine3,soyougotthreetraumaalerts.You'resayingyougotonepersontrapped?Howaretheothertwo?There'sthreetraumaalerts.IfIcangetthreestretcherscominguphere.Theothergentleman'strapped.Heappearstobecuring.He'sonaportionofthebridgethatcamedown.He'skindofjuststuckupthere.I'llletyouknow.QSL.

Police now report three or four individuals may be injured at the construction site.

Miami FR Tac K · 0:17
Commandtoincomingunits,beadvised,we'remakingourwayuptheramphereon3rdAve.Policeisadvisingwehavethreeorfourpatientsatthistime.Stillworkingourwayupthere.I'llletyouguysknow.Keepallunitsforward.

Units are advised to clear the area for fire rescue and be cautious of a leaning pillar and nails on the ground.

Miami PD Central Ch 3 · 0:31
Justhavealltheunitsclearoutofthewaysorescuecandotheirthing.That'sclear,7.Allvehiclesthatarecurrentlyblockingjusttomakewayforfirerescue,justre-advisinganyvehiclesthatareblockingjusttomakewayforfirerescueat2224,showyoucoming.4331,alsotelltheunitsthattheyneedtobecautiousbecausethepillarisleaningoverandthere'salotofnailsontheground.That'sclear,7.unitstotakecaution,justadvisethepillarontheside.you'realmostgoingtobelookingatthisside,thepillarat2220.Alright,2220,letmegetaunitinthere,I'mgoingtoneedasearch.

Rescue operations are underway, with vehicles being moved to clear access for emergency responders.

Miami PD Central Ch 3 · 0:30
QSL,we'regoingtohavethreerespondingnow,2223.QSL,one'sgoingtobehere,isgoingtobeopen.Helookslikehe'sathis30s.Wehaveonethat'sgoingtobe,it'sgoingtobehis40s.He'sresponsive,buthe'sdownaswell.Andthenwehaveanotheronethat'sgoingtobedown,that'sQSL.That'sQSL,we'lladvisenow,2223.That'sQSL.Andgoaheadandmakeamessageforengines.Idohaveanotheronethat'sresponsive,butlookslikehe'sathis40s.That'sQSL,they'rereallybeingadvisednowat2223.Isthereanymonitoring?ág
Miami PD Central Ch 3 · 0:31
Nora30,urgent.1424,Ineedthoseunitstogetthosevehiclesoutofthething.That'sQSL.41,4321,letmegettothat,please.That'sQSL,we'regoingtostartarescuenow,2220.4390,I'llshowyouincommand,4390.90,Ineedthosevehiclesmovedoutnowforrescuebecauseit'sontheoverhere.Ineedaunittolockoffthetraffic.

Additional resources are being sent to the construction site for further assessment.

Miami PD North Ch 1 · 0:18
5,Chief1,Chief2,Chief3,deltaresponse,bridgecollapse,possibleconstruction.Henry,sendthatwreckoverheretothe18Foxtrot,Big3,YankeeGolf.Goingtobegoingtobe,uh,theautopower.

First responders report no injuries found at the construction site collapse.

Miami PD Central Ch 3 · 0:30
4333,showmeenroute,23.QSL,showmeenrouteto2231U.S.15.90.QSK.Okay,soifyouhaven'tfoundanything,there'smultiple,youcanshowustheotheropeningsunderneaththe395,please.33,reference.QSK.Wemadecontactwithoneoftheconstructionguys.Oneofthepillarsthatwasperp-Wedon'tseeanybodyinjured.It'sgoingtobeintheconstructionsite.Okay.

Reports indicate the collapse involved a work bridge at the construction site.

Miami PD Central Ch 3 · 0:20
QSL,4330.QSL,4330.That'sQSL,4330.4330.Alright,what'sthereferenceonthe3?Ididn'tgetthatpart.QSL,it'safamilyatawork,collapsed.Believesthatthereisdestructionatthetop,it'sjustaworkbridge.24-11,canyourepeat?

First responders are coordinating efforts at the construction site collapse.

Miami PD Central Ch 3 · 0:15
4334,makeita315,4331,15.1490Northwest3rd.Opening.1490Northwest3rd.Disruptingtoa411.Raiseyourhandforus.2219.4331.

First responders received a 911 report of a construction site collapse.

Miami PD Central Ch 3 · 0:30
QSL,QSL,unitsin10fornow,1490NorthWest3rdAvenue.showmeinaarrival,whatunitisthat?QSL,theyadvisedfortheformerworkbridge,theycouldn'tgetfurther.QSL.1490NorthWest3rdAvenue,714.Advisingunitsin315,1490NorthWest3rdAvenue,714,2220.again?Theyadvisedfortheformerworkbridgethatcollapsed.Theadvisingunitsto1490NorthWest3rd,I'llget...

A 911 caller has reported an unconfirmed incident at 1490 NW 3rd Ave.

All construction workers are being brought out as rescue operations wind down.

Miami FR Tac K · 0:19
Chieftothecommand,we'rebringingalltheconstructionworkersout.Rescueusup,I'mgoingtostartwithunits.Command2,area1.Area1,K.Area1,takearun.10-34.

All workers are accounted for, and operations are being shut down at the construction site.

Miami FR Tac K · 0:31
Command,we'vecountedforallworkers.We'reabouttogotozeromechanicalstateandshutdowneverything.QSL.Everyoneisonit.Okay.Let'smakesurewetakethatarea,makesurenooneiswatchingthatarea.I'mgoingtohavecontact,EFD,seeiftheyshutthatroaddownoratleastthatlane.QSL,ifwecanidentify,10-4,wecanalwaysputaunitthereinablockofahighway.

Radio clips available.

Miami FR Tac K · 0:30
Command2,Chief2.Chief2tocommand.Hey,itlookslikethe,uh,thatthingwantstotoppleover.It'sjustbeingheldupbythearmoftheconcretepump.Iwanttogetoutofthatarea.Chief2tocommand,we'regoingtohavetoshutdownthatsectionofroadwaythatrunsalongthealso.ItshouldbeinfrontoftheborderoftheColossal.QSL?QSL.

Rescue teams confirm no additional patient transport is needed at the construction site.

Miami FR Tac K · 0:16
Rescue2,putmetocommand.QSL,QSL.We'regoing09fromRiderTravel.Doyouneedanymorepatientstransported?Negative,we'regood.Thankyou.QSL.

Evacuation of the area is underway as the concrete bunk is the only support holding the form.

Miami FR Tac K · 0:15
Key3toKey3,youwantDREevacuated?That'sQSL.Let'sstartevacuatingeverybodyout.Theonlythingholdingaformrightnowwethinkistheconcretebunk.

The final victim is on a stretcher, and teams are confirming with the foreman that no one is missing.

Miami FR Tac K · 0:31
Rescue9tocommand,youwantustoheadovertherewithastretcherjustincase?Chief2tocommand.QSL,Rescue9,makeitover.Goahead,Chief2.Wehavethefinalvictimonthestretcherheadingdown.We'rejusttryingtogetaheadcountfromtheforemantomakesurethatwe'renotmissinganybodyinthefloor.We'regoingtogoaheadandevacuatetheareaaswell.Thankyou,I'llgoaheadandevacuateandseeifwegetabuildingfromtheairport.Makesurewehavecontact.QSL.

Rescue teams confirm six patients have been transported from the construction site.

Miami FR Dispatch · 0:10
Beadvised,atotalofsixpatientshavebeentransported,totalofsix.Totalofsixtosevenpatients?

Rescue teams confirm all patients accounted for and are coordinating further actions on 16th Street and 3rd Avenue.

Miami FR Tac K · 0:19
unitscommand,wearearrivalon16thStreetand3rdAve.QSL,10-9.JustPRus,wegotallourpatients,letmeconfirm.You'reenroutefornow.QSL.

Rescue teams are coordinating with Chief 1 to confirm the number of patients at the site.

Miami FR Dispatch · 0:12
Youcangoaheadandset07Rescue12,07Rescue12.QSL,Chief1,07Rescue12.Chief1,approximatelyhowmanypatientsdoyouhave?

A rescue unit is transporting a trauma patient from the construction site.

Miami FR Dispatch · 0:10
MiamiRescue22,transportingridertrauma.10-4,Rescue22,transportingridertrauma,2241,ma'am.Chief1,ma'am.Chief1,QSK.

Rescue teams have freed the trapped individual and are preparing to place him on a stretcher for evacuation.

Miami FR Tac K · 0:19
Chief2tocommand.Command,goahead.We'vegotthegentlemanoutoftheform.We'reattemptingtobringhimdownnowandthenwe'rejustgoingtoevacuatethisareaandcorditoff.QSL,they'regettingreadytobringitdownandtrytogethimonthestretcher.QSL?QSL,yougotastretcherthatway?

Rescue teams have freed the trapped individual and are preparing to clear the area.

Miami PD Central Ch 3 · 0:31
42,4130.arusticvehicleandfollowthoserescuetrucks,please.Gotit.justtomakewayforfirerescueat2240.4130.130,go.QSL,justtoverifyifyouwerealsoonthesceneon315.Roger.QSK.QSK.Unit,whathappened?2143,Igotthelastrescuehere.We'renowatrestnumber5.Uh,it'sageneration.There'sonemoreindividualringthat'sstuckupintheatthecar.QSL,324.QSL.

Rescue teams have successfully freed the trapped individual and are preparing to evacuate the area.

Two rescue units are on scene, preparing to transport patients from the construction site.

Miami PD Central Ch 3 · 0:24
DF4,13.4390,they'recurrentlyrespondingjustareferencetoWestBunksideandthey'restilltryingtogetanATAnow.Police,thankyou.That'sQSL,2239.423.423.AlrightMiami,wegottworescueunitsrightnow,Rescue23andRescue2.Regardstoalltheunitsinthearea,10-8.QSL,canyoustarttellingwhereyouare?I'mprettysurethey'reallgoingtobetrauma,regardlessoftheconditions.QSL,thisis2220.
Miami FR Tac K · 0:22
We're,uh,cleartohavein16thStreet.Phone1,nozzletocommand,beadvised,transportingwithrescue2to,we'llletthecleargo.29,Ineedyou,pleasemakeyourwayoverhereto,uh,15thand15thStreet.Thisisalittleincident,alright,ifyoucancomefromthenorthside,comefromthesouth,Ineedyoucloser.You'regoingtobemynexttransportunit,clear.

Authorities are coordinating with highway patrol to manage traffic on 395 during the ongoing rescue efforts.

Miami PD Central Ch 3 · 0:13
And95.95.Whenyoucan,givemethestatusofFHPonthe395.Iftheycanatleasttheandweshutitdownwhilethey'reworkingonthispieceofit,seeifthey'llseecars.We'reat,uh,cleartohavein16thStreet.

Two more rescue units are being dispatched to the construction site for assistance.

Miami FR Dispatch · 0:10
Miami,Iaskedforthreeadditionalrescuesandyouonlysentmeoneadditionalone.Goaheadandsendmetwomore,please.QSL,twomoreadditionalrescues.2238Miami.

Rescue teams are staging with fire rescue to load patients and prepare for transport.

Miami PD Central Ch 3 · 0:20
2390.Yes,sir?Wecheckedforbutnoresponse.Appreciateyou.124isgoingtobestagingwithfirerescuewherethey'reloadingupthepatients.Andassoonastheystartex-failandleaving,he'sgoingtoannounceitsowecanassignunitstothoserescuetrucks,please.That'sclear,2238.

14th Street is being closed to assist with rescue operations at the construction site.

Miami PD Central Ch 3 · 0:30
7603.7603.Iwant14thStreetshutdownaswell.Beadvised,14thStreet,eastoftheWest.Alright,Iwantitshutdown.That'sQSK,wecurrentlyhaveourunitsstuckandthey'regoingtobeholding3and13now,QSL.ifyoucan,let'scrossdispatchanybodyfromtheeast.Theycan,I'mgoingtoneedonetoshut14overon,let'smakeit1stAvenueandthenanotheroneon7thAvenue.Nothingcomes.

A rescue unit has arrived on the north side, and a stretcher is being requested.

Miami FR Tac K · 0:22
25,youcanshowusarrivalonthenorthside.Doweneedabackboardorjustastretcher?That'sQSL.Youguyscopythat?Doyouwantabackboardtooorjustastretcher?Justastretcher,justastretcher.23isarriving,stagingonNorthwest3rdAveand14th.Whatdoweneed?7603,we'reenroute.

Rescue teams are preparing to evacuate the area after moving one more victim from the site.

Miami FR Tac K · 0:30
Command2toarea1.2SO.Area1,K.Ijustgotanewvehicleinthewaitinghouse,youguysareblockingthemoutoftheway.2OSo,sendyourdrivernow.Chieftothecommand.CommandK.Wegotonemorevictimwho'sabouttocalloutZoom.We'regoingtogoaheadandmovethemout.Thenwe'lljustseeTRTuphere.We'regoingtotrytoextricateonefromtheformandthenwecanevacuatethewholearea.3Sir,yousaidyougotonenow,yougotonemorecat?Yeah,Ithinkyou'regoingtoevacuatethewholearea.Copy.

Rescue teams are assessing the leaning structure, which appears to have fallen off a pillar.

Miami PD Central Ch 3 · 0:31
Ma'am,sorry,didyouread?Ihaveeverybodymeetattheirfirstchoice.FromtheThat'sQSL,justadvisingallunitscheckingthepressure,it'sgoingtobea43andat2234.10-4,QSL.QA.QSL,canyouadviseeastandwestreferenceto394?Whichisclosesttodistrict'sHP?Rightnow,we'relookingatthewestboundtraffic,buthavethemassessbecausethewaythisstructureisleaning,itlookslikeitfelloffoneofthepillarsandit'sactuallyleaning.So,whatit'sgoingtodoorwhatit'sgoingtodois...

Another stretcher is being brought up the ramp, and an additional rescue unit is arriving from the north side.

Miami FR Tac K · 0:31
Engine2tocommand,dowehaveanotherstretchercominguptheramphere?Engine5,goaheadwithcommand,wehaveanotherstretchercomingup.909,rescue22.Chief3toChief1.Hey.Chief,I'mbeingadvisedbyEMS1thatwe'regoingtoneedonemorerescue.Yes,sir.Youshouldbegettingrescue25inaminute.Thereshouldbeafromthenorthside.Engine2,I'mgettingarescue.Yeah.

Traffic is being blocked east and west on 395 to ensure safety around the unstable structure.

Miami PD Central Ch 3 · 0:26
4220.4220.We'regoingtohavetoblock,um,EastandWeston395.Wedon'tknowaboutthestructure.It'sstraightLondon.Andit's,uh,itcanmakeit22the8thtoMetro.That'sclear.We'llgetthemtheinnercitynow,22-32.That'sgoingtobebetweenFoxandthe3,like35.That'sclear,sir.We'lladvisethemnowat22-32.

Rescue teams are setting up lights to assist with the ongoing operation at the construction site.

Miami FR Tac K · 0:28
CommandtoChief2.TRTcommand,we'regoingtobemovingallthepeopleoutofthecallroomexceptforTRT.Wehaveonepersontrappedupintheforum.We'llbemovingthatonein.That'sQSL,IcanmoveeverybodyoutexceptforTRT.Youwantmetosetupsomelightsoverthere?Youguysgoodwithlights?14,youhavealighttoshoot?That'sQSL,letmeknowwhatelseyouguysneed.Igotmorerescuegoing.

Rescue teams are preparing to stabilize the bridge structure at the construction site.

Miami PD Central Ch 3 · 0:15
You'regoingtohavetogivemealittlebitonthatone,please.LetmeknowassoonasIcan.QSL,doyouhavethesuper-barrelforthebridge?1725.QSL.Justgiveusaminuteandwe'llgoaheadandO2thebridge.Justgiveusaminute.QSL,thankyou.

Two additional backboards are being sent to assist with rescue efforts at the site.

Miami FR Tac K · 0:14
Hazmat1toanyrescuedownbelow,canwegetonemorebackboard?Rescue1toMiami,we'rebringingyouguystoHazmat.We'vegottwobackboardsontheway.QSL.

Units are clearing vehicles from 3rd Avenue to allow fire rescue operations to proceed.

Vehicles are being moved to clear the way for fire rescue operations on 3rd Avenue.

Miami PD Central Ch 3 · 0:29
AndIneedtwounitsonstandbyassoonastherescuestartsgoingtofollowrescuetoJackson.That'sclear.Justforyourunits,justtosayonthe3rdAvenuesideuntilfurtherinstructedfor2390.Justtosaythat,justtosayonthe3rdAvenuesideuntilfurtherinstructed,1349.Anyunitsthatcanfollowforfirerescue?Vehicleson3rdAvenuebetween14thStreetand15thStreet,youneedtomoveyourvehicle.Firerescueneedstobedoneonthevehicle.Yes,sounitsthatcanbebetween3rdAvenueand14thand15th,justtomoveyourvehicleforfirerescue.3rdAvenueand14thand15th,justtomoveyourvehiclesat2329.

Rescue teams request a backboard for a person with a broken arm at the site.

Miami FR Tac K · 0:07
Weneedabackboard,wegotaoverherewithabrokenarmandanothertree.CSO,anythreemore?

Rescue teams are stabilizing one person and working on two others. Additional units are waiting for instructions nearby.

Miami PD Central Ch 3 · 0:30
4234.4234.Uh,intersection5,youcanshow4234and4233onit.9QSL.What'sthechange,20inthehouse,263.90.10-K.They'reputtingonedown,uh,they'rerampoverheretowardsthestreet.Andthey'retryingto,uh,they'reworkingontheothertworightnow.Twounits.Wedon'tneedanymoreunitscomingoverheretowardsthething.Havethemwaitinthestreeton3rdAvenueforfurtherinstructions.Yeah.

Rescue teams confirm one person remains trapped, and additional rescue units are being requested for assistance.

Miami FR Tac K · 0:31
Man,beadvised,thispersonthatkilledus,itdoesn'tmakethatstable.Thegentlemanistrapped,andwehaveoneperson,onepatientthat'sstillsomewhatunderthepossiblefactszone.QSL,you'resayingyougotatleastonepatienttrappedandit'sastable?Rightnow,IgotRescue22andRescue2andRescue5ontheirwaytoyoutogetthepatientthatnowtrapped.QSL?QSL,we'regoingtoneedafourthandafifthrescue.QSL.

Rescue teams are coordinating medical transfers and assessing the situation for safe extrication at the site.

Miami FR Tac K · 0:31
2Rescue22andRescue5.Youguyswillbethemedicaltransferrightnow,makingwaytotheincidentandwecantrytoreceivethepatients.Phone1,command,we'rearrival.Youneedmetogoupthereandassesswhatweneedforextrication?10-4,I'mmakingmywayupthere,assessthesituation,seewhatweneedtodotogetsafetyintheretoassist.Homesback1,we'reontherun,butwe'lljoinphone1andseewhatthesituationisthere.10-4,Iread1.Thankyou.

Additional rescue units are on the move to assist at the construction site collapse.

Miami FR Tac K · 0:30
QSW,startassessingandseewhatweneed.Inthemeantime,Command2,Rescue22,Rescue5,andnextincomingrescue,you'llbethemedicalunitstomakeyourwaytothescene.Command2,Rescue22,youcopythat?QSL,we'regettingwayoffinsearchesandequipment.QSL,Rescue22and2.Command2,Rescue5.QSL,Rescue5,we'reonthemove.QSL,Rescue5,we'reonthemove.

Rescue teams report one person trapped on the east side of the collapse, with three trauma alerts issued.

Miami PD Central Ch 3 · 0:30
Igotthat,uh,medicout.QSL.QSL,4133,I'llshowyouenroutetothe22.4390,canyourescueaCP?RescueaCP,Eastboundon14thStreetforasecond.Makesurewegetthenumbertoargue.4390.90,everybody'shere.Justmeandwasattemptingtoevict.CPwillputitrightnowfor314untiloursergeantarrives.I'mhearingtheinterior.QSL,showtheCPfor314nowandtryto225.Justre-advancingourunitstotakecaution.It'sgoingtobeonit.Justre-advancingforthepublic.73.
Miami FR Tac K · 0:31
There'sa,itlookslikehe'stalking.He'strappedupontheeastsidecollapse.That'sQSLEngine3,soyougotthreetraumaalerts.You'resayingyougotonepersontrapped?Howaretheothertwo?There'sthreetraumaalerts.IfIcangetthreestretcherscominguphere.Theothergentleman'strapped.Heappearstobecuring.He'sonaportionofthebridgethatcamedown.He'skindofjuststuckupthere.I'llletyouknow.QSL.

Police now report three or four individuals may be injured at the construction site.

Miami FR Tac K · 0:17
Commandtoincomingunits,beadvised,we'remakingourwayuptheramphereon3rdAve.Policeisadvisingwehavethreeorfourpatientsatthistime.Stillworkingourwayupthere.I'llletyouguysknow.Keepallunitsforward.

Units are advised to clear the area for fire rescue and be cautious of a leaning pillar and nails on the ground.

Miami PD Central Ch 3 · 0:31
Justhavealltheunitsclearoutofthewaysorescuecandotheirthing.That'sclear,7.Allvehiclesthatarecurrentlyblockingjusttomakewayforfirerescue,justre-advisinganyvehiclesthatareblockingjusttomakewayforfirerescueat2224,showyoucoming.4331,alsotelltheunitsthattheyneedtobecautiousbecausethepillarisleaningoverandthere'salotofnailsontheground.That'sclear,7.unitstotakecaution,justadvisethepillarontheside.you'realmostgoingtobelookingatthisside,thepillarat2220.Alright,2220,letmegetaunitinthere,I'mgoingtoneedasearch.

Rescue operations are underway, with vehicles being moved to clear access for emergency responders.

Miami PD Central Ch 3 · 0:30
QSL,we'regoingtohavethreerespondingnow,2223.QSL,one'sgoingtobehere,isgoingtobeopen.Helookslikehe'sathis30s.Wehaveonethat'sgoingtobe,it'sgoingtobehis40s.He'sresponsive,buthe'sdownaswell.Andthenwehaveanotheronethat'sgoingtobedown,that'sQSL.That'sQSL,we'lladvisenow,2223.That'sQSL.Andgoaheadandmakeamessageforengines.Idohaveanotheronethat'sresponsive,butlookslikehe'sathis40s.That'sQSL,they'rereallybeingadvisednowat2223.Isthereanymonitoring?ág
Miami PD Central Ch 3 · 0:31
Nora30,urgent.1424,Ineedthoseunitstogetthosevehiclesoutofthething.That'sQSL.41,4321,letmegettothat,please.That'sQSL,we'regoingtostartarescuenow,2220.4390,I'llshowyouincommand,4390.90,Ineedthosevehiclesmovedoutnowforrescuebecauseit'sontheoverhere.Ineedaunittolockoffthetraffic.

Additional resources are being sent to the construction site for further assessment.

Miami PD North Ch 1 · 0:18
5,Chief1,Chief2,Chief3,deltaresponse,bridgecollapse,possibleconstruction.Henry,sendthatwreckoverheretothe18Foxtrot,Big3,YankeeGolf.Goingtobegoingtobe,uh,theautopower.

First responders report no injuries found at the construction site collapse.

Miami PD Central Ch 3 · 0:30
4333,showmeenroute,23.QSL,showmeenrouteto2231U.S.15.90.QSK.Okay,soifyouhaven'tfoundanything,there'smultiple,youcanshowustheotheropeningsunderneaththe395,please.33,reference.QSK.Wemadecontactwithoneoftheconstructionguys.Oneofthepillarsthatwasperp-Wedon'tseeanybodyinjured.It'sgoingtobeintheconstructionsite.Okay.

Reports indicate the collapse involved a work bridge at the construction site.

Miami PD Central Ch 3 · 0:20
QSL,4330.QSL,4330.That'sQSL,4330.4330.Alright,what'sthereferenceonthe3?Ididn'tgetthatpart.QSL,it'safamilyatawork,collapsed.Believesthatthereisdestructionatthetop,it'sjustaworkbridge.24-11,canyourepeat?

First responders are coordinating efforts at the construction site collapse.

Miami PD Central Ch 3 · 0:15
4334,makeita315,4331,15.1490Northwest3rd.Opening.1490Northwest3rd.Disruptingtoa411.Raiseyourhandforus.2219.4331.

First responders received a 911 report of a construction site collapse.

Miami PD Central Ch 3 · 0:30
QSL,QSL,unitsin10fornow,1490NorthWest3rdAvenue.showmeinaarrival,whatunitisthat?QSL,theyadvisedfortheformerworkbridge,theycouldn'tgetfurther.QSL.1490NorthWest3rdAvenue,714.Advisingunitsin315,1490NorthWest3rdAvenue,714,2220.again?Theyadvisedfortheformerworkbridgethatcollapsed.Theadvisingunitsto1490NorthWest3rd,I'llget...

A 911 caller has reported an unconfirmed incident at 1490 NW 3rd Ave.

All construction workers are being brought out as rescue operations wind down.

Miami FR Tac K · 0:19
Chieftothecommand,we'rebringingalltheconstructionworkersout.Rescueusup,I'mgoingtostartwithunits.Command2,area1.Area1,K.Area1,takearun.10-34.

All workers are accounted for, and operations are being shut down at the construction site.

Miami FR Tac K · 0:31
Command,we'vecountedforallworkers.We'reabouttogotozeromechanicalstateandshutdowneverything.QSL.Everyoneisonit.Okay.Let'smakesurewetakethatarea,makesurenooneiswatchingthatarea.I'mgoingtohavecontact,EFD,seeiftheyshutthatroaddownoratleastthatlane.QSL,ifwecanidentify,10-4,wecanalwaysputaunitthereinablockofahighway.

Radio clips available.

Miami FR Tac K · 0:30
Command2,Chief2.Chief2tocommand.Hey,itlookslikethe,uh,thatthingwantstotoppleover.It'sjustbeingheldupbythearmoftheconcretepump.Iwanttogetoutofthatarea.Chief2tocommand,we'regoingtohavetoshutdownthatsectionofroadwaythatrunsalongthealso.ItshouldbeinfrontoftheborderoftheColossal.QSL?QSL.

Rescue teams confirm no additional patient transport is needed at the construction site.

Miami FR Tac K · 0:16
Rescue2,putmetocommand.QSL,QSL.We'regoing09fromRiderTravel.Doyouneedanymorepatientstransported?Negative,we'regood.Thankyou.QSL.

Evacuation of the area is underway as the concrete bunk is the only support holding the form.

Miami FR Tac K · 0:15
Key3toKey3,youwantDREevacuated?That'sQSL.Let'sstartevacuatingeverybodyout.Theonlythingholdingaformrightnowwethinkistheconcretebunk.

The final victim is on a stretcher, and teams are confirming with the foreman that no one is missing.

Miami FR Tac K · 0:31
Rescue9tocommand,youwantustoheadovertherewithastretcherjustincase?Chief2tocommand.QSL,Rescue9,makeitover.Goahead,Chief2.Wehavethefinalvictimonthestretcherheadingdown.We'rejusttryingtogetaheadcountfromtheforemantomakesurethatwe'renotmissinganybodyinthefloor.We'regoingtogoaheadandevacuatetheareaaswell.Thankyou,I'llgoaheadandevacuateandseeifwegetabuildingfromtheairport.Makesurewehavecontact.QSL.

Rescue teams confirm six patients have been transported from the construction site.

Miami FR Dispatch · 0:10
Beadvised,atotalofsixpatientshavebeentransported,totalofsix.Totalofsixtosevenpatients?

Rescue teams confirm all patients accounted for and are coordinating further actions on 16th Street and 3rd Avenue.

Miami FR Tac K · 0:19
unitscommand,wearearrivalon16thStreetand3rdAve.QSL,10-9.JustPRus,wegotallourpatients,letmeconfirm.You'reenroutefornow.QSL.

Rescue teams are coordinating with Chief 1 to confirm the number of patients at the site.

Miami FR Dispatch · 0:12
Youcangoaheadandset07Rescue12,07Rescue12.QSL,Chief1,07Rescue12.Chief1,approximatelyhowmanypatientsdoyouhave?

A rescue unit is transporting a trauma patient from the construction site.

Miami FR Dispatch · 0:10
MiamiRescue22,transportingridertrauma.10-4,Rescue22,transportingridertrauma,2241,ma'am.Chief1,ma'am.Chief1,QSK.

Rescue teams have freed the trapped individual and are preparing to place him on a stretcher for evacuation.

Miami FR Tac K · 0:19
Chief2tocommand.Command,goahead.We'vegotthegentlemanoutoftheform.We'reattemptingtobringhimdownnowandthenwe'rejustgoingtoevacuatethisareaandcorditoff.QSL,they'regettingreadytobringitdownandtrytogethimonthestretcher.QSL?QSL,yougotastretcherthatway?

Rescue teams have freed the trapped individual and are preparing to clear the area.

Miami PD Central Ch 3 · 0:31
42,4130.arusticvehicleandfollowthoserescuetrucks,please.Gotit.justtomakewayforfirerescueat2240.4130.130,go.QSL,justtoverifyifyouwerealsoonthesceneon315.Roger.QSK.QSK.Unit,whathappened?2143,Igotthelastrescuehere.We'renowatrestnumber5.Uh,it'sageneration.There'sonemoreindividualringthat'sstuckupintheatthecar.QSL,324.QSL.

Rescue teams have successfully freed the trapped individual and are preparing to evacuate the area.

Two rescue units are on scene, preparing to transport patients from the construction site.

Miami PD Central Ch 3 · 0:24
DF4,13.4390,they'recurrentlyrespondingjustareferencetoWestBunksideandthey'restilltryingtogetanATAnow.Police,thankyou.That'sQSL,2239.423.423.AlrightMiami,wegottworescueunitsrightnow,Rescue23andRescue2.Regardstoalltheunitsinthearea,10-8.QSL,canyoustarttellingwhereyouare?I'mprettysurethey'reallgoingtobetrauma,regardlessoftheconditions.QSL,thisis2220.
Miami FR Tac K · 0:22
We're,uh,cleartohavein16thStreet.Phone1,nozzletocommand,beadvised,transportingwithrescue2to,we'llletthecleargo.29,Ineedyou,pleasemakeyourwayoverhereto,uh,15thand15thStreet.Thisisalittleincident,alright,ifyoucancomefromthenorthside,comefromthesouth,Ineedyoucloser.You'regoingtobemynexttransportunit,clear.

Authorities are coordinating with highway patrol to manage traffic on 395 during the ongoing rescue efforts.

Miami PD Central Ch 3 · 0:13
And95.95.Whenyoucan,givemethestatusofFHPonthe395.Iftheycanatleasttheandweshutitdownwhilethey'reworkingonthispieceofit,seeifthey'llseecars.We'reat,uh,cleartohavein16thStreet.

Two more rescue units are being dispatched to the construction site for assistance.

Miami FR Dispatch · 0:10
Miami,Iaskedforthreeadditionalrescuesandyouonlysentmeoneadditionalone.Goaheadandsendmetwomore,please.QSL,twomoreadditionalrescues.2238Miami.

Rescue teams are staging with fire rescue to load patients and prepare for transport.

Miami PD Central Ch 3 · 0:20
2390.Yes,sir?Wecheckedforbutnoresponse.Appreciateyou.124isgoingtobestagingwithfirerescuewherethey'reloadingupthepatients.Andassoonastheystartex-failandleaving,he'sgoingtoannounceitsowecanassignunitstothoserescuetrucks,please.That'sclear,2238.

14th Street is being closed to assist with rescue operations at the construction site.

Miami PD Central Ch 3 · 0:30
7603.7603.Iwant14thStreetshutdownaswell.Beadvised,14thStreet,eastoftheWest.Alright,Iwantitshutdown.That'sQSK,wecurrentlyhaveourunitsstuckandthey'regoingtobeholding3and13now,QSL.ifyoucan,let'scrossdispatchanybodyfromtheeast.Theycan,I'mgoingtoneedonetoshut14overon,let'smakeit1stAvenueandthenanotheroneon7thAvenue.Nothingcomes.

A rescue unit has arrived on the north side, and a stretcher is being requested.

Miami FR Tac K · 0:22
25,youcanshowusarrivalonthenorthside.Doweneedabackboardorjustastretcher?That'sQSL.Youguyscopythat?Doyouwantabackboardtooorjustastretcher?Justastretcher,justastretcher.23isarriving,stagingonNorthwest3rdAveand14th.Whatdoweneed?7603,we'reenroute.

Rescue teams are preparing to evacuate the area after moving one more victim from the site.

Miami FR Tac K · 0:30
Command2toarea1.2SO.Area1,K.Ijustgotanewvehicleinthewaitinghouse,youguysareblockingthemoutoftheway.2OSo,sendyourdrivernow.Chieftothecommand.CommandK.Wegotonemorevictimwho'sabouttocalloutZoom.We'regoingtogoaheadandmovethemout.Thenwe'lljustseeTRTuphere.We'regoingtotrytoextricateonefromtheformandthenwecanevacuatethewholearea.3Sir,yousaidyougotonenow,yougotonemorecat?Yeah,Ithinkyou'regoingtoevacuatethewholearea.Copy.

Rescue teams are assessing the leaning structure, which appears to have fallen off a pillar.

Miami PD Central Ch 3 · 0:31
Ma'am,sorry,didyouread?Ihaveeverybodymeetattheirfirstchoice.FromtheThat'sQSL,justadvisingallunitscheckingthepressure,it'sgoingtobea43andat2234.10-4,QSL.QA.QSL,canyouadviseeastandwestreferenceto394?Whichisclosesttodistrict'sHP?Rightnow,we'relookingatthewestboundtraffic,buthavethemassessbecausethewaythisstructureisleaning,itlookslikeitfelloffoneofthepillarsandit'sactuallyleaning.So,whatit'sgoingtodoorwhatit'sgoingtodois...

Another stretcher is being brought up the ramp, and an additional rescue unit is arriving from the north side.

Miami FR Tac K · 0:31
Engine2tocommand,dowehaveanotherstretchercominguptheramphere?Engine5,goaheadwithcommand,wehaveanotherstretchercomingup.909,rescue22.Chief3toChief1.Hey.Chief,I'mbeingadvisedbyEMS1thatwe'regoingtoneedonemorerescue.Yes,sir.Youshouldbegettingrescue25inaminute.Thereshouldbeafromthenorthside.Engine2,I'mgettingarescue.Yeah.

Traffic is being blocked east and west on 395 to ensure safety around the unstable structure.

Miami PD Central Ch 3 · 0:26
4220.4220.We'regoingtohavetoblock,um,EastandWeston395.Wedon'tknowaboutthestructure.It'sstraightLondon.Andit's,uh,itcanmakeit22the8thtoMetro.That'sclear.We'llgetthemtheinnercitynow,22-32.That'sgoingtobebetweenFoxandthe3,like35.That'sclear,sir.We'lladvisethemnowat22-32.

Rescue teams are setting up lights to assist with the ongoing operation at the construction site.

Miami FR Tac K · 0:28
CommandtoChief2.TRTcommand,we'regoingtobemovingallthepeopleoutofthecallroomexceptforTRT.Wehaveonepersontrappedupintheforum.We'llbemovingthatonein.That'sQSL,IcanmoveeverybodyoutexceptforTRT.Youwantmetosetupsomelightsoverthere?Youguysgoodwithlights?14,youhavealighttoshoot?That'sQSL,letmeknowwhatelseyouguysneed.Igotmorerescuegoing.

Rescue teams are preparing to stabilize the bridge structure at the construction site.

Miami PD Central Ch 3 · 0:15
You'regoingtohavetogivemealittlebitonthatone,please.LetmeknowassoonasIcan.QSL,doyouhavethesuper-barrelforthebridge?1725.QSL.Justgiveusaminuteandwe'llgoaheadandO2thebridge.Justgiveusaminute.QSL,thankyou.

Two additional backboards are being sent to assist with rescue efforts at the site.

Miami FR Tac K · 0:14
Hazmat1toanyrescuedownbelow,canwegetonemorebackboard?Rescue1toMiami,we'rebringingyouguystoHazmat.We'vegottwobackboardsontheway.QSL.

Units are clearing vehicles from 3rd Avenue to allow fire rescue operations to proceed.

Vehicles are being moved to clear the way for fire rescue operations on 3rd Avenue.

Miami PD Central Ch 3 · 0:29
AndIneedtwounitsonstandbyassoonastherescuestartsgoingtofollowrescuetoJackson.That'sclear.Justforyourunits,justtosayonthe3rdAvenuesideuntilfurtherinstructedfor2390.Justtosaythat,justtosayonthe3rdAvenuesideuntilfurtherinstructed,1349.Anyunitsthatcanfollowforfirerescue?Vehicleson3rdAvenuebetween14thStreetand15thStreet,youneedtomoveyourvehicle.Firerescueneedstobedoneonthevehicle.Yes,sounitsthatcanbebetween3rdAvenueand14thand15th,justtomoveyourvehicleforfirerescue.3rdAvenueand14thand15th,justtomoveyourvehiclesat2329.

Rescue teams request a backboard for a person with a broken arm at the site.

Miami FR Tac K · 0:07
Weneedabackboard,wegotaoverherewithabrokenarmandanothertree.CSO,anythreemore?

Rescue teams are stabilizing one person and working on two others. Additional units are waiting for instructions nearby.

Miami PD Central Ch 3 · 0:30
4234.4234.Uh,intersection5,youcanshow4234and4233onit.9QSL.What'sthechange,20inthehouse,263.90.10-K.They'reputtingonedown,uh,they'rerampoverheretowardsthestreet.Andthey'retryingto,uh,they'reworkingontheothertworightnow.Twounits.Wedon'tneedanymoreunitscomingoverheretowardsthething.Havethemwaitinthestreeton3rdAvenueforfurtherinstructions.Yeah.

Rescue teams confirm one person remains trapped, and additional rescue units are being requested for assistance.

Miami FR Tac K · 0:31
Man,beadvised,thispersonthatkilledus,itdoesn'tmakethatstable.Thegentlemanistrapped,andwehaveoneperson,onepatientthat'sstillsomewhatunderthepossiblefactszone.QSL,you'resayingyougotatleastonepatienttrappedandit'sastable?Rightnow,IgotRescue22andRescue2andRescue5ontheirwaytoyoutogetthepatientthatnowtrapped.QSL?QSL,we'regoingtoneedafourthandafifthrescue.QSL.

Rescue teams are coordinating medical transfers and assessing the situation for safe extrication at the site.

Miami FR Tac K · 0:31
2Rescue22andRescue5.Youguyswillbethemedicaltransferrightnow,makingwaytotheincidentandwecantrytoreceivethepatients.Phone1,command,we'rearrival.Youneedmetogoupthereandassesswhatweneedforextrication?10-4,I'mmakingmywayupthere,assessthesituation,seewhatweneedtodotogetsafetyintheretoassist.Homesback1,we'reontherun,butwe'lljoinphone1andseewhatthesituationisthere.10-4,Iread1.Thankyou.

Additional rescue units are on the move to assist at the construction site collapse.

Miami FR Tac K · 0:30
QSW,startassessingandseewhatweneed.Inthemeantime,Command2,Rescue22,Rescue5,andnextincomingrescue,you'llbethemedicalunitstomakeyourwaytothescene.Command2,Rescue22,youcopythat?QSL,we'regettingwayoffinsearchesandequipment.QSL,Rescue22and2.Command2,Rescue5.QSL,Rescue5,we'reonthemove.QSL,Rescue5,we'reonthemove.

Rescue teams report one person trapped on the east side of the collapse, with three trauma alerts issued.

Miami PD Central Ch 3 · 0:30
Igotthat,uh,medicout.QSL.QSL,4133,I'llshowyouenroutetothe22.4390,canyourescueaCP?RescueaCP,Eastboundon14thStreetforasecond.Makesurewegetthenumbertoargue.4390.90,everybody'shere.Justmeandwasattemptingtoevict.CPwillputitrightnowfor314untiloursergeantarrives.I'mhearingtheinterior.QSL,showtheCPfor314nowandtryto225.Justre-advancingourunitstotakecaution.It'sgoingtobeonit.Justre-advancingforthepublic.73.
Miami FR Tac K · 0:31
There'sa,itlookslikehe'stalking.He'strappedupontheeastsidecollapse.That'sQSLEngine3,soyougotthreetraumaalerts.You'resayingyougotonepersontrapped?Howaretheothertwo?There'sthreetraumaalerts.IfIcangetthreestretcherscominguphere.Theothergentleman'strapped.Heappearstobecuring.He'sonaportionofthebridgethatcamedown.He'skindofjuststuckupthere.I'llletyouknow.QSL.

Police now report three or four individuals may be injured at the construction site.

Miami FR Tac K · 0:17
Commandtoincomingunits,beadvised,we'remakingourwayuptheramphereon3rdAve.Policeisadvisingwehavethreeorfourpatientsatthistime.Stillworkingourwayupthere.I'llletyouguysknow.Keepallunitsforward.

Units are advised to clear the area for fire rescue and be cautious of a leaning pillar and nails on the ground.

Miami PD Central Ch 3 · 0:31
Justhavealltheunitsclearoutofthewaysorescuecandotheirthing.That'sclear,7.Allvehiclesthatarecurrentlyblockingjusttomakewayforfirerescue,justre-advisinganyvehiclesthatareblockingjusttomakewayforfirerescueat2224,showyoucoming.4331,alsotelltheunitsthattheyneedtobecautiousbecausethepillarisleaningoverandthere'salotofnailsontheground.That'sclear,7.unitstotakecaution,justadvisethepillarontheside.you'realmostgoingtobelookingatthisside,thepillarat2220.Alright,2220,letmegetaunitinthere,I'mgoingtoneedasearch.

Rescue operations are underway, with vehicles being moved to clear access for emergency responders.

Miami PD Central Ch 3 · 0:30
QSL,we'regoingtohavethreerespondingnow,2223.QSL,one'sgoingtobehere,isgoingtobeopen.Helookslikehe'sathis30s.Wehaveonethat'sgoingtobe,it'sgoingtobehis40s.He'sresponsive,buthe'sdownaswell.Andthenwehaveanotheronethat'sgoingtobedown,that'sQSL.That'sQSL,we'lladvisenow,2223.That'sQSL.Andgoaheadandmakeamessageforengines.Idohaveanotheronethat'sresponsive,butlookslikehe'sathis40s.That'sQSL,they'rereallybeingadvisednowat2223.Isthereanymonitoring?ág
Miami PD Central Ch 3 · 0:31
Nora30,urgent.1424,Ineedthoseunitstogetthosevehiclesoutofthething.That'sQSL.41,4321,letmegettothat,please.That'sQSL,we'regoingtostartarescuenow,2220.4390,I'llshowyouincommand,4390.90,Ineedthosevehiclesmovedoutnowforrescuebecauseit'sontheoverhere.Ineedaunittolockoffthetraffic.

Additional resources are being sent to the construction site for further assessment.

Miami PD North Ch 1 · 0:18
5,Chief1,Chief2,Chief3,deltaresponse,bridgecollapse,possibleconstruction.Henry,sendthatwreckoverheretothe18Foxtrot,Big3,YankeeGolf.Goingtobegoingtobe,uh,theautopower.

First responders report no injuries found at the construction site collapse.

Miami PD Central Ch 3 · 0:30
4333,showmeenroute,23.QSL,showmeenrouteto2231U.S.15.90.QSK.Okay,soifyouhaven'tfoundanything,there'smultiple,youcanshowustheotheropeningsunderneaththe395,please.33,reference.QSK.Wemadecontactwithoneoftheconstructionguys.Oneofthepillarsthatwasperp-Wedon'tseeanybodyinjured.It'sgoingtobeintheconstructionsite.Okay.

Reports indicate the collapse involved a work bridge at the construction site.

Miami PD Central Ch 3 · 0:20
QSL,4330.QSL,4330.That'sQSL,4330.4330.Alright,what'sthereferenceonthe3?Ididn'tgetthatpart.QSL,it'safamilyatawork,collapsed.Believesthatthereisdestructionatthetop,it'sjustaworkbridge.24-11,canyourepeat?

First responders are coordinating efforts at the construction site collapse.

Miami PD Central Ch 3 · 0:15
4334,makeita315,4331,15.1490Northwest3rd.Opening.1490Northwest3rd.Disruptingtoa411.Raiseyourhandforus.2219.4331.

First responders received a 911 report of a construction site collapse.

Miami PD Central Ch 3 · 0:30
QSL,QSL,unitsin10fornow,1490NorthWest3rdAvenue.showmeinaarrival,whatunitisthat?QSL,theyadvisedfortheformerworkbridge,theycouldn'tgetfurther.QSL.1490NorthWest3rdAvenue,714.Advisingunitsin315,1490NorthWest3rdAvenue,714,2220.again?Theyadvisedfortheformerworkbridgethatcollapsed.Theadvisingunitsto1490NorthWest3rd,I'llget...

A 911 caller has reported an unconfirmed incident at 1490 NW 3rd Ave.

All construction workers are being brought out as rescue operations wind down.

Miami FR Tac K · 0:19
Chieftothecommand,we'rebringingalltheconstructionworkersout.Rescueusup,I'mgoingtostartwithunits.Command2,area1.Area1,K.Area1,takearun.10-34.

All workers are accounted for, and operations are being shut down at the construction site.

Miami FR Tac K · 0:31
Command,we'vecountedforallworkers.We'reabouttogotozeromechanicalstateandshutdowneverything.QSL.Everyoneisonit.Okay.Let'smakesurewetakethatarea,makesurenooneiswatchingthatarea.I'mgoingtohavecontact,EFD,seeiftheyshutthatroaddownoratleastthatlane.QSL,ifwecanidentify,10-4,wecanalwaysputaunitthereinablockofahighway.

Radio clips available.

Miami FR Tac K · 0:30
Command2,Chief2.Chief2tocommand.Hey,itlookslikethe,uh,thatthingwantstotoppleover.It'sjustbeingheldupbythearmoftheconcretepump.Iwanttogetoutofthatarea.Chief2tocommand,we'regoingtohavetoshutdownthatsectionofroadwaythatrunsalongthealso.ItshouldbeinfrontoftheborderoftheColossal.QSL?QSL.

Rescue teams confirm no additional patient transport is needed at the construction site.

Miami FR Tac K · 0:16
Rescue2,putmetocommand.QSL,QSL.We'regoing09fromRiderTravel.Doyouneedanymorepatientstransported?Negative,we'regood.Thankyou.QSL.

Evacuation of the area is underway as the concrete bunk is the only support holding the form.

Miami FR Tac K · 0:15
Key3toKey3,youwantDREevacuated?That'sQSL.Let'sstartevacuatingeverybodyout.Theonlythingholdingaformrightnowwethinkistheconcretebunk.

The final victim is on a stretcher, and teams are confirming with the foreman that no one is missing.

Miami FR Tac K · 0:31
Rescue9tocommand,youwantustoheadovertherewithastretcherjustincase?Chief2tocommand.QSL,Rescue9,makeitover.Goahead,Chief2.Wehavethefinalvictimonthestretcherheadingdown.We'rejusttryingtogetaheadcountfromtheforemantomakesurethatwe'renotmissinganybodyinthefloor.We'regoingtogoaheadandevacuatetheareaaswell.Thankyou,I'llgoaheadandevacuateandseeifwegetabuildingfromtheairport.Makesurewehavecontact.QSL.

Rescue teams confirm six patients have been transported from the construction site.

Miami FR Dispatch · 0:10
Beadvised,atotalofsixpatientshavebeentransported,totalofsix.Totalofsixtosevenpatients?

Rescue teams confirm all patients accounted for and are coordinating further actions on 16th Street and 3rd Avenue.

Miami FR Tac K · 0:19
unitscommand,wearearrivalon16thStreetand3rdAve.QSL,10-9.JustPRus,wegotallourpatients,letmeconfirm.You'reenroutefornow.QSL.

Rescue teams are coordinating with Chief 1 to confirm the number of patients at the site.

Miami FR Dispatch · 0:12
Youcangoaheadandset07Rescue12,07Rescue12.QSL,Chief1,07Rescue12.Chief1,approximatelyhowmanypatientsdoyouhave?

A rescue unit is transporting a trauma patient from the construction site.

Miami FR Dispatch · 0:10
MiamiRescue22,transportingridertrauma.10-4,Rescue22,transportingridertrauma,2241,ma'am.Chief1,ma'am.Chief1,QSK.

Rescue teams have freed the trapped individual and are preparing to place him on a stretcher for evacuation.

Miami FR Tac K · 0:19
Chief2tocommand.Command,goahead.We'vegotthegentlemanoutoftheform.We'reattemptingtobringhimdownnowandthenwe'rejustgoingtoevacuatethisareaandcorditoff.QSL,they'regettingreadytobringitdownandtrytogethimonthestretcher.QSL?QSL,yougotastretcherthatway?

Rescue teams have freed the trapped individual and are preparing to clear the area.

Miami PD Central Ch 3 · 0:31
42,4130.arusticvehicleandfollowthoserescuetrucks,please.Gotit.justtomakewayforfirerescueat2240.4130.130,go.QSL,justtoverifyifyouwerealsoonthesceneon315.Roger.QSK.QSK.Unit,whathappened?2143,Igotthelastrescuehere.We'renowatrestnumber5.Uh,it'sageneration.There'sonemoreindividualringthat'sstuckupintheatthecar.QSL,324.QSL.

Rescue teams have successfully freed the trapped individual and are preparing to evacuate the area.

Two rescue units are on scene, preparing to transport patients from the construction site.

Miami PD Central Ch 3 · 0:24
DF4,13.4390,they'recurrentlyrespondingjustareferencetoWestBunksideandthey'restilltryingtogetanATAnow.Police,thankyou.That'sQSL,2239.423.423.AlrightMiami,wegottworescueunitsrightnow,Rescue23andRescue2.Regardstoalltheunitsinthearea,10-8.QSL,canyoustarttellingwhereyouare?I'mprettysurethey'reallgoingtobetrauma,regardlessoftheconditions.QSL,thisis2220.
Miami FR Tac K · 0:22
We're,uh,cleartohavein16thStreet.Phone1,nozzletocommand,beadvised,transportingwithrescue2to,we'llletthecleargo.29,Ineedyou,pleasemakeyourwayoverhereto,uh,15thand15thStreet.Thisisalittleincident,alright,ifyoucancomefromthenorthside,comefromthesouth,Ineedyoucloser.You'regoingtobemynexttransportunit,clear.

Authorities are coordinating with highway patrol to manage traffic on 395 during the ongoing rescue efforts.

Miami PD Central Ch 3 · 0:13
And95.95.Whenyoucan,givemethestatusofFHPonthe395.Iftheycanatleasttheandweshutitdownwhilethey'reworkingonthispieceofit,seeifthey'llseecars.We'reat,uh,cleartohavein16thStreet.

Two more rescue units are being dispatched to the construction site for assistance.

Miami FR Dispatch · 0:10
Miami,Iaskedforthreeadditionalrescuesandyouonlysentmeoneadditionalone.Goaheadandsendmetwomore,please.QSL,twomoreadditionalrescues.2238Miami.

Rescue teams are staging with fire rescue to load patients and prepare for transport.

Miami PD Central Ch 3 · 0:20
2390.Yes,sir?Wecheckedforbutnoresponse.Appreciateyou.124isgoingtobestagingwithfirerescuewherethey'reloadingupthepatients.Andassoonastheystartex-failandleaving,he'sgoingtoannounceitsowecanassignunitstothoserescuetrucks,please.That'sclear,2238.

14th Street is being closed to assist with rescue operations at the construction site.

Miami PD Central Ch 3 · 0:30
7603.7603.Iwant14thStreetshutdownaswell.Beadvised,14thStreet,eastoftheWest.Alright,Iwantitshutdown.That'sQSK,wecurrentlyhaveourunitsstuckandthey'regoingtobeholding3and13now,QSL.ifyoucan,let'scrossdispatchanybodyfromtheeast.Theycan,I'mgoingtoneedonetoshut14overon,let'smakeit1stAvenueandthenanotheroneon7thAvenue.Nothingcomes.

A rescue unit has arrived on the north side, and a stretcher is being requested.

Miami FR Tac K · 0:22
25,youcanshowusarrivalonthenorthside.Doweneedabackboardorjustastretcher?That'sQSL.Youguyscopythat?Doyouwantabackboardtooorjustastretcher?Justastretcher,justastretcher.23isarriving,stagingonNorthwest3rdAveand14th.Whatdoweneed?7603,we'reenroute.

Rescue teams are preparing to evacuate the area after moving one more victim from the site.

Miami FR Tac K · 0:30
Command2toarea1.2SO.Area1,K.Ijustgotanewvehicleinthewaitinghouse,youguysareblockingthemoutoftheway.2OSo,sendyourdrivernow.Chieftothecommand.CommandK.Wegotonemorevictimwho'sabouttocalloutZoom.We'regoingtogoaheadandmovethemout.Thenwe'lljustseeTRTuphere.We'regoingtotrytoextricateonefromtheformandthenwecanevacuatethewholearea.3Sir,yousaidyougotonenow,yougotonemorecat?Yeah,Ithinkyou'regoingtoevacuatethewholearea.Copy.

Rescue teams are assessing the leaning structure, which appears to have fallen off a pillar.

Miami PD Central Ch 3 · 0:31
Ma'am,sorry,didyouread?Ihaveeverybodymeetattheirfirstchoice.FromtheThat'sQSL,justadvisingallunitscheckingthepressure,it'sgoingtobea43andat2234.10-4,QSL.QA.QSL,canyouadviseeastandwestreferenceto394?Whichisclosesttodistrict'sHP?Rightnow,we'relookingatthewestboundtraffic,buthavethemassessbecausethewaythisstructureisleaning,itlookslikeitfelloffoneofthepillarsandit'sactuallyleaning.So,whatit'sgoingtodoorwhatit'sgoingtodois...

Another stretcher is being brought up the ramp, and an additional rescue unit is arriving from the north side.

Miami FR Tac K · 0:31
Engine2tocommand,dowehaveanotherstretchercominguptheramphere?Engine5,goaheadwithcommand,wehaveanotherstretchercomingup.909,rescue22.Chief3toChief1.Hey.Chief,I'mbeingadvisedbyEMS1thatwe'regoingtoneedonemorerescue.Yes,sir.Youshouldbegettingrescue25inaminute.Thereshouldbeafromthenorthside.Engine2,I'mgettingarescue.Yeah.

Traffic is being blocked east and west on 395 to ensure safety around the unstable structure.

Miami PD Central Ch 3 · 0:26
4220.4220.We'regoingtohavetoblock,um,EastandWeston395.Wedon'tknowaboutthestructure.It'sstraightLondon.Andit's,uh,itcanmakeit22the8thtoMetro.That'sclear.We'llgetthemtheinnercitynow,22-32.That'sgoingtobebetweenFoxandthe3,like35.That'sclear,sir.We'lladvisethemnowat22-32.

Rescue teams are setting up lights to assist with the ongoing operation at the construction site.

Miami FR Tac K · 0:28
CommandtoChief2.TRTcommand,we'regoingtobemovingallthepeopleoutofthecallroomexceptforTRT.Wehaveonepersontrappedupintheforum.We'llbemovingthatonein.That'sQSL,IcanmoveeverybodyoutexceptforTRT.Youwantmetosetupsomelightsoverthere?Youguysgoodwithlights?14,youhavealighttoshoot?That'sQSL,letmeknowwhatelseyouguysneed.Igotmorerescuegoing.

Rescue teams are preparing to stabilize the bridge structure at the construction site.

Miami PD Central Ch 3 · 0:15
You'regoingtohavetogivemealittlebitonthatone,please.LetmeknowassoonasIcan.QSL,doyouhavethesuper-barrelforthebridge?1725.QSL.Justgiveusaminuteandwe'llgoaheadandO2thebridge.Justgiveusaminute.QSL,thankyou.

Two additional backboards are being sent to assist with rescue efforts at the site.

Miami FR Tac K · 0:14
Hazmat1toanyrescuedownbelow,canwegetonemorebackboard?Rescue1toMiami,we'rebringingyouguystoHazmat.We'vegottwobackboardsontheway.QSL.

Units are clearing vehicles from 3rd Avenue to allow fire rescue operations to proceed.

Vehicles are being moved to clear the way for fire rescue operations on 3rd Avenue.

Miami PD Central Ch 3 · 0:29
AndIneedtwounitsonstandbyassoonastherescuestartsgoingtofollowrescuetoJackson.That'sclear.Justforyourunits,justtosayonthe3rdAvenuesideuntilfurtherinstructedfor2390.Justtosaythat,justtosayonthe3rdAvenuesideuntilfurtherinstructed,1349.Anyunitsthatcanfollowforfirerescue?Vehicleson3rdAvenuebetween14thStreetand15thStreet,youneedtomoveyourvehicle.Firerescueneedstobedoneonthevehicle.Yes,sounitsthatcanbebetween3rdAvenueand14thand15th,justtomoveyourvehicleforfirerescue.3rdAvenueand14thand15th,justtomoveyourvehiclesat2329.

Rescue teams request a backboard for a person with a broken arm at the site.

Miami FR Tac K · 0:07
Weneedabackboard,wegotaoverherewithabrokenarmandanothertree.CSO,anythreemore?

Rescue teams are stabilizing one person and working on two others. Additional units are waiting for instructions nearby.

Miami PD Central Ch 3 · 0:30
4234.4234.Uh,intersection5,youcanshow4234and4233onit.9QSL.What'sthechange,20inthehouse,263.90.10-K.They'reputtingonedown,uh,they'rerampoverheretowardsthestreet.Andthey'retryingto,uh,they'reworkingontheothertworightnow.Twounits.Wedon'tneedanymoreunitscomingoverheretowardsthething.Havethemwaitinthestreeton3rdAvenueforfurtherinstructions.Yeah.

Rescue teams confirm one person remains trapped, and additional rescue units are being requested for assistance.

Miami FR Tac K · 0:31
Man,beadvised,thispersonthatkilledus,itdoesn'tmakethatstable.Thegentlemanistrapped,andwehaveoneperson,onepatientthat'sstillsomewhatunderthepossiblefactszone.QSL,you'resayingyougotatleastonepatienttrappedandit'sastable?Rightnow,IgotRescue22andRescue2andRescue5ontheirwaytoyoutogetthepatientthatnowtrapped.QSL?QSL,we'regoingtoneedafourthandafifthrescue.QSL.

Rescue teams are coordinating medical transfers and assessing the situation for safe extrication at the site.

Miami FR Tac K · 0:31
2Rescue22andRescue5.Youguyswillbethemedicaltransferrightnow,makingwaytotheincidentandwecantrytoreceivethepatients.Phone1,command,we'rearrival.Youneedmetogoupthereandassesswhatweneedforextrication?10-4,I'mmakingmywayupthere,assessthesituation,seewhatweneedtodotogetsafetyintheretoassist.Homesback1,we'reontherun,butwe'lljoinphone1andseewhatthesituationisthere.10-4,Iread1.Thankyou.

Additional rescue units are on the move to assist at the construction site collapse.

Miami FR Tac K · 0:30
QSW,startassessingandseewhatweneed.Inthemeantime,Command2,Rescue22,Rescue5,andnextincomingrescue,you'llbethemedicalunitstomakeyourwaytothescene.Command2,Rescue22,youcopythat?QSL,we'regettingwayoffinsearchesandequipment.QSL,Rescue22and2.Command2,Rescue5.QSL,Rescue5,we'reonthemove.QSL,Rescue5,we'reonthemove.

Rescue teams report one person trapped on the east side of the collapse, with three trauma alerts issued.

Miami PD Central Ch 3 · 0:30
Igotthat,uh,medicout.QSL.QSL,4133,I'llshowyouenroutetothe22.4390,canyourescueaCP?RescueaCP,Eastboundon14thStreetforasecond.Makesurewegetthenumbertoargue.4390.90,everybody'shere.Justmeandwasattemptingtoevict.CPwillputitrightnowfor314untiloursergeantarrives.I'mhearingtheinterior.QSL,showtheCPfor314nowandtryto225.Justre-advancingourunitstotakecaution.It'sgoingtobeonit.Justre-advancingforthepublic.73.
Miami FR Tac K · 0:31
There'sa,itlookslikehe'stalking.He'strappedupontheeastsidecollapse.That'sQSLEngine3,soyougotthreetraumaalerts.You'resayingyougotonepersontrapped?Howaretheothertwo?There'sthreetraumaalerts.IfIcangetthreestretcherscominguphere.Theothergentleman'strapped.Heappearstobecuring.He'sonaportionofthebridgethatcamedown.He'skindofjuststuckupthere.I'llletyouknow.QSL.

Police now report three or four individuals may be injured at the construction site.

Miami FR Tac K · 0:17
Commandtoincomingunits,beadvised,we'remakingourwayuptheramphereon3rdAve.Policeisadvisingwehavethreeorfourpatientsatthistime.Stillworkingourwayupthere.I'llletyouguysknow.Keepallunitsforward.

Units are advised to clear the area for fire rescue and be cautious of a leaning pillar and nails on the ground.

Miami PD Central Ch 3 · 0:31
Justhavealltheunitsclearoutofthewaysorescuecandotheirthing.That'sclear,7.Allvehiclesthatarecurrentlyblockingjusttomakewayforfirerescue,justre-advisinganyvehiclesthatareblockingjusttomakewayforfirerescueat2224,showyoucoming.4331,alsotelltheunitsthattheyneedtobecautiousbecausethepillarisleaningoverandthere'salotofnailsontheground.That'sclear,7.unitstotakecaution,justadvisethepillarontheside.you'realmostgoingtobelookingatthisside,thepillarat2220.Alright,2220,letmegetaunitinthere,I'mgoingtoneedasearch.

Rescue operations are underway, with vehicles being moved to clear access for emergency responders.

Miami PD Central Ch 3 · 0:30
QSL,we'regoingtohavethreerespondingnow,2223.QSL,one'sgoingtobehere,isgoingtobeopen.Helookslikehe'sathis30s.Wehaveonethat'sgoingtobe,it'sgoingtobehis40s.He'sresponsive,buthe'sdownaswell.Andthenwehaveanotheronethat'sgoingtobedown,that'sQSL.That'sQSL,we'lladvisenow,2223.That'sQSL.Andgoaheadandmakeamessageforengines.Idohaveanotheronethat'sresponsive,butlookslikehe'sathis40s.That'sQSL,they'rereallybeingadvisednowat2223.Isthereanymonitoring?ág
Miami PD Central Ch 3 · 0:31
Nora30,urgent.1424,Ineedthoseunitstogetthosevehiclesoutofthething.That'sQSL.41,4321,letmegettothat,please.That'sQSL,we'regoingtostartarescuenow,2220.4390,I'llshowyouincommand,4390.90,Ineedthosevehiclesmovedoutnowforrescuebecauseit'sontheoverhere.Ineedaunittolockoffthetraffic.

Additional resources are being sent to the construction site for further assessment.

Miami PD North Ch 1 · 0:18
5,Chief1,Chief2,Chief3,deltaresponse,bridgecollapse,possibleconstruction.Henry,sendthatwreckoverheretothe18Foxtrot,Big3,YankeeGolf.Goingtobegoingtobe,uh,theautopower.

First responders report no injuries found at the construction site collapse.

Miami PD Central Ch 3 · 0:30
4333,showmeenroute,23.QSL,showmeenrouteto2231U.S.15.90.QSK.Okay,soifyouhaven'tfoundanything,there'smultiple,youcanshowustheotheropeningsunderneaththe395,please.33,reference.QSK.Wemadecontactwithoneoftheconstructionguys.Oneofthepillarsthatwasperp-Wedon'tseeanybodyinjured.It'sgoingtobeintheconstructionsite.Okay.

Reports indicate the collapse involved a work bridge at the construction site.

Miami PD Central Ch 3 · 0:20
QSL,4330.QSL,4330.That'sQSL,4330.4330.Alright,what'sthereferenceonthe3?Ididn'tgetthatpart.QSL,it'safamilyatawork,collapsed.Believesthatthereisdestructionatthetop,it'sjustaworkbridge.24-11,canyourepeat?

First responders are coordinating efforts at the construction site collapse.

Miami PD Central Ch 3 · 0:15
4334,makeita315,4331,15.1490Northwest3rd.Opening.1490Northwest3rd.Disruptingtoa411.Raiseyourhandforus.2219.4331.

First responders received a 911 report of a construction site collapse.

Miami PD Central Ch 3 · 0:30
QSL,QSL,unitsin10fornow,1490NorthWest3rdAvenue.showmeinaarrival,whatunitisthat?QSL,theyadvisedfortheformerworkbridge,theycouldn'tgetfurther.QSL.1490NorthWest3rdAvenue,714.Advisingunitsin315,1490NorthWest3rdAvenue,714,2220.again?Theyadvisedfortheformerworkbridgethatcollapsed.Theadvisingunitsto1490NorthWest3rd,I'llget...

A 911 caller has reported an unconfirmed incident at 1490 NW 3rd Ave.

All construction workers are being brought out as rescue operations wind down.

Miami FR Tac K · 0:19
Chieftothecommand,we'rebringingalltheconstructionworkersout.Rescueusup,I'mgoingtostartwithunits.Command2,area1.Area1,K.Area1,takearun.10-34.

All workers are accounted for, and operations are being shut down at the construction site.

Miami FR Tac K · 0:31
Command,we'vecountedforallworkers.We'reabouttogotozeromechanicalstateandshutdowneverything.QSL.Everyoneisonit.Okay.Let'smakesurewetakethatarea,makesurenooneiswatchingthatarea.I'mgoingtohavecontact,EFD,seeiftheyshutthatroaddownoratleastthatlane.QSL,ifwecanidentify,10-4,wecanalwaysputaunitthereinablockofahighway.

Radio clips available.

Miami FR Tac K · 0:30
Command2,Chief2.Chief2tocommand.Hey,itlookslikethe,uh,thatthingwantstotoppleover.It'sjustbeingheldupbythearmoftheconcretepump.Iwanttogetoutofthatarea.Chief2tocommand,we'regoingtohavetoshutdownthatsectionofroadwaythatrunsalongthealso.ItshouldbeinfrontoftheborderoftheColossal.QSL?QSL.

Rescue teams confirm no additional patient transport is needed at the construction site.

Miami FR Tac K · 0:16
Rescue2,putmetocommand.QSL,QSL.We'regoing09fromRiderTravel.Doyouneedanymorepatientstransported?Negative,we'regood.Thankyou.QSL.

Evacuation of the area is underway as the concrete bunk is the only support holding the form.

Miami FR Tac K · 0:15
Key3toKey3,youwantDREevacuated?That'sQSL.Let'sstartevacuatingeverybodyout.Theonlythingholdingaformrightnowwethinkistheconcretebunk.

The final victim is on a stretcher, and teams are confirming with the foreman that no one is missing.

Miami FR Tac K · 0:31
Rescue9tocommand,youwantustoheadovertherewithastretcherjustincase?Chief2tocommand.QSL,Rescue9,makeitover.Goahead,Chief2.Wehavethefinalvictimonthestretcherheadingdown.We'rejusttryingtogetaheadcountfromtheforemantomakesurethatwe'renotmissinganybodyinthefloor.We'regoingtogoaheadandevacuatetheareaaswell.Thankyou,I'llgoaheadandevacuateandseeifwegetabuildingfromtheairport.Makesurewehavecontact.QSL.

Rescue teams confirm six patients have been transported from the construction site.

Miami FR Dispatch · 0:10
Beadvised,atotalofsixpatientshavebeentransported,totalofsix.Totalofsixtosevenpatients?

Rescue teams confirm all patients accounted for and are coordinating further actions on 16th Street and 3rd Avenue.

Miami FR Tac K · 0:19
unitscommand,wearearrivalon16thStreetand3rdAve.QSL,10-9.JustPRus,wegotallourpatients,letmeconfirm.You'reenroutefornow.QSL.

Rescue teams are coordinating with Chief 1 to confirm the number of patients at the site.

Miami FR Dispatch · 0:12
Youcangoaheadandset07Rescue12,07Rescue12.QSL,Chief1,07Rescue12.Chief1,approximatelyhowmanypatientsdoyouhave?

A rescue unit is transporting a trauma patient from the construction site.

Miami FR Dispatch · 0:10
MiamiRescue22,transportingridertrauma.10-4,Rescue22,transportingridertrauma,2241,ma'am.Chief1,ma'am.Chief1,QSK.

Rescue teams have freed the trapped individual and are preparing to place him on a stretcher for evacuation.

Miami FR Tac K · 0:19
Chief2tocommand.Command,goahead.We'vegotthegentlemanoutoftheform.We'reattemptingtobringhimdownnowandthenwe'rejustgoingtoevacuatethisareaandcorditoff.QSL,they'regettingreadytobringitdownandtrytogethimonthestretcher.QSL?QSL,yougotastretcherthatway?

Rescue teams have freed the trapped individual and are preparing to clear the area.

Miami PD Central Ch 3 · 0:31
42,4130.arusticvehicleandfollowthoserescuetrucks,please.Gotit.justtomakewayforfirerescueat2240.4130.130,go.QSL,justtoverifyifyouwerealsoonthesceneon315.Roger.QSK.QSK.Unit,whathappened?2143,Igotthelastrescuehere.We'renowatrestnumber5.Uh,it'sageneration.There'sonemoreindividualringthat'sstuckupintheatthecar.QSL,324.QSL.

Rescue teams have successfully freed the trapped individual and are preparing to evacuate the area.

Two rescue units are on scene, preparing to transport patients from the construction site.

Miami PD Central Ch 3 · 0:24
DF4,13.4390,they'recurrentlyrespondingjustareferencetoWestBunksideandthey'restilltryingtogetanATAnow.Police,thankyou.That'sQSL,2239.423.423.AlrightMiami,wegottworescueunitsrightnow,Rescue23andRescue2.Regardstoalltheunitsinthearea,10-8.QSL,canyoustarttellingwhereyouare?I'mprettysurethey'reallgoingtobetrauma,regardlessoftheconditions.QSL,thisis2220.
Miami FR Tac K · 0:22
We're,uh,cleartohavein16thStreet.Phone1,nozzletocommand,beadvised,transportingwithrescue2to,we'llletthecleargo.29,Ineedyou,pleasemakeyourwayoverhereto,uh,15thand15thStreet.Thisisalittleincident,alright,ifyoucancomefromthenorthside,comefromthesouth,Ineedyoucloser.You'regoingtobemynexttransportunit,clear.

Authorities are coordinating with highway patrol to manage traffic on 395 during the ongoing rescue efforts.

Miami PD Central Ch 3 · 0:13
And95.95.Whenyoucan,givemethestatusofFHPonthe395.Iftheycanatleasttheandweshutitdownwhilethey'reworkingonthispieceofit,seeifthey'llseecars.We'reat,uh,cleartohavein16thStreet.

Two more rescue units are being dispatched to the construction site for assistance.

Miami FR Dispatch · 0:10
Miami,Iaskedforthreeadditionalrescuesandyouonlysentmeoneadditionalone.Goaheadandsendmetwomore,please.QSL,twomoreadditionalrescues.2238Miami.

Rescue teams are staging with fire rescue to load patients and prepare for transport.

Miami PD Central Ch 3 · 0:20
2390.Yes,sir?Wecheckedforbutnoresponse.Appreciateyou.124isgoingtobestagingwithfirerescuewherethey'reloadingupthepatients.Andassoonastheystartex-failandleaving,he'sgoingtoannounceitsowecanassignunitstothoserescuetrucks,please.That'sclear,2238.

14th Street is being closed to assist with rescue operations at the construction site.

Miami PD Central Ch 3 · 0:30
7603.7603.Iwant14thStreetshutdownaswell.Beadvised,14thStreet,eastoftheWest.Alright,Iwantitshutdown.That'sQSK,wecurrentlyhaveourunitsstuckandthey'regoingtobeholding3and13now,QSL.ifyoucan,let'scrossdispatchanybodyfromtheeast.Theycan,I'mgoingtoneedonetoshut14overon,let'smakeit1stAvenueandthenanotheroneon7thAvenue.Nothingcomes.

A rescue unit has arrived on the north side, and a stretcher is being requested.

Miami FR Tac K · 0:22
25,youcanshowusarrivalonthenorthside.Doweneedabackboardorjustastretcher?That'sQSL.Youguyscopythat?Doyouwantabackboardtooorjustastretcher?Justastretcher,justastretcher.23isarriving,stagingonNorthwest3rdAveand14th.Whatdoweneed?7603,we'reenroute.

Rescue teams are preparing to evacuate the area after moving one more victim from the site.

Miami FR Tac K · 0:30
Command2toarea1.2SO.Area1,K.Ijustgotanewvehicleinthewaitinghouse,youguysareblockingthemoutoftheway.2OSo,sendyourdrivernow.Chieftothecommand.CommandK.Wegotonemorevictimwho'sabouttocalloutZoom.We'regoingtogoaheadandmovethemout.Thenwe'lljustseeTRTuphere.We'regoingtotrytoextricateonefromtheformandthenwecanevacuatethewholearea.3Sir,yousaidyougotonenow,yougotonemorecat?Yeah,Ithinkyou'regoingtoevacuatethewholearea.Copy.

Rescue teams are assessing the leaning structure, which appears to have fallen off a pillar.

Miami PD Central Ch 3 · 0:31
Ma'am,sorry,didyouread?Ihaveeverybodymeetattheirfirstchoice.FromtheThat'sQSL,justadvisingallunitscheckingthepressure,it'sgoingtobea43andat2234.10-4,QSL.QA.QSL,canyouadviseeastandwestreferenceto394?Whichisclosesttodistrict'sHP?Rightnow,we'relookingatthewestboundtraffic,buthavethemassessbecausethewaythisstructureisleaning,itlookslikeitfelloffoneofthepillarsandit'sactuallyleaning.So,whatit'sgoingtodoorwhatit'sgoingtodois...

Another stretcher is being brought up the ramp, and an additional rescue unit is arriving from the north side.

Miami FR Tac K · 0:31
Engine2tocommand,dowehaveanotherstretchercominguptheramphere?Engine5,goaheadwithcommand,wehaveanotherstretchercomingup.909,rescue22.Chief3toChief1.Hey.Chief,I'mbeingadvisedbyEMS1thatwe'regoingtoneedonemorerescue.Yes,sir.Youshouldbegettingrescue25inaminute.Thereshouldbeafromthenorthside.Engine2,I'mgettingarescue.Yeah.

Traffic is being blocked east and west on 395 to ensure safety around the unstable structure.

Miami PD Central Ch 3 · 0:26
4220.4220.We'regoingtohavetoblock,um,EastandWeston395.Wedon'tknowaboutthestructure.It'sstraightLondon.Andit's,uh,itcanmakeit22the8thtoMetro.That'sclear.We'llgetthemtheinnercitynow,22-32.That'sgoingtobebetweenFoxandthe3,like35.That'sclear,sir.We'lladvisethemnowat22-32.

Rescue teams are setting up lights to assist with the ongoing operation at the construction site.

Miami FR Tac K · 0:28
CommandtoChief2.TRTcommand,we'regoingtobemovingallthepeopleoutofthecallroomexceptforTRT.Wehaveonepersontrappedupintheforum.We'llbemovingthatonein.That'sQSL,IcanmoveeverybodyoutexceptforTRT.Youwantmetosetupsomelightsoverthere?Youguysgoodwithlights?14,youhavealighttoshoot?That'sQSL,letmeknowwhatelseyouguysneed.Igotmorerescuegoing.

Rescue teams are preparing to stabilize the bridge structure at the construction site.

Miami PD Central Ch 3 · 0:15
You'regoingtohavetogivemealittlebitonthatone,please.LetmeknowassoonasIcan.QSL,doyouhavethesuper-barrelforthebridge?1725.QSL.Justgiveusaminuteandwe'llgoaheadandO2thebridge.Justgiveusaminute.QSL,thankyou.

Two additional backboards are being sent to assist with rescue efforts at the site.

Miami FR Tac K · 0:14
Hazmat1toanyrescuedownbelow,canwegetonemorebackboard?Rescue1toMiami,we'rebringingyouguystoHazmat.We'vegottwobackboardsontheway.QSL.

Units are clearing vehicles from 3rd Avenue to allow fire rescue operations to proceed.

Vehicles are being moved to clear the way for fire rescue operations on 3rd Avenue.

Miami PD Central Ch 3 · 0:29
AndIneedtwounitsonstandbyassoonastherescuestartsgoingtofollowrescuetoJackson.That'sclear.Justforyourunits,justtosayonthe3rdAvenuesideuntilfurtherinstructedfor2390.Justtosaythat,justtosayonthe3rdAvenuesideuntilfurtherinstructed,1349.Anyunitsthatcanfollowforfirerescue?Vehicleson3rdAvenuebetween14thStreetand15thStreet,youneedtomoveyourvehicle.Firerescueneedstobedoneonthevehicle.Yes,sounitsthatcanbebetween3rdAvenueand14thand15th,justtomoveyourvehicleforfirerescue.3rdAvenueand14thand15th,justtomoveyourvehiclesat2329.

Rescue teams request a backboard for a person with a broken arm at the site.

Miami FR Tac K · 0:07
Weneedabackboard,wegotaoverherewithabrokenarmandanothertree.CSO,anythreemore?

Rescue teams are stabilizing one person and working on two others. Additional units are waiting for instructions nearby.

Miami PD Central Ch 3 · 0:30
4234.4234.Uh,intersection5,youcanshow4234and4233onit.9QSL.What'sthechange,20inthehouse,263.90.10-K.They'reputtingonedown,uh,they'rerampoverheretowardsthestreet.Andthey'retryingto,uh,they'reworkingontheothertworightnow.Twounits.Wedon'tneedanymoreunitscomingoverheretowardsthething.Havethemwaitinthestreeton3rdAvenueforfurtherinstructions.Yeah.

Rescue teams confirm one person remains trapped, and additional rescue units are being requested for assistance.

Miami FR Tac K · 0:31
Man,beadvised,thispersonthatkilledus,itdoesn'tmakethatstable.Thegentlemanistrapped,andwehaveoneperson,onepatientthat'sstillsomewhatunderthepossiblefactszone.QSL,you'resayingyougotatleastonepatienttrappedandit'sastable?Rightnow,IgotRescue22andRescue2andRescue5ontheirwaytoyoutogetthepatientthatnowtrapped.QSL?QSL,we'regoingtoneedafourthandafifthrescue.QSL.

Rescue teams are coordinating medical transfers and assessing the situation for safe extrication at the site.

Miami FR Tac K · 0:31
2Rescue22andRescue5.Youguyswillbethemedicaltransferrightnow,makingwaytotheincidentandwecantrytoreceivethepatients.Phone1,command,we'rearrival.Youneedmetogoupthereandassesswhatweneedforextrication?10-4,I'mmakingmywayupthere,assessthesituation,seewhatweneedtodotogetsafetyintheretoassist.Homesback1,we'reontherun,butwe'lljoinphone1andseewhatthesituationisthere.10-4,Iread1.Thankyou.

Additional rescue units are on the move to assist at the construction site collapse.

Miami FR Tac K · 0:30
QSW,startassessingandseewhatweneed.Inthemeantime,Command2,Rescue22,Rescue5,andnextincomingrescue,you'llbethemedicalunitstomakeyourwaytothescene.Command2,Rescue22,youcopythat?QSL,we'regettingwayoffinsearchesandequipment.QSL,Rescue22and2.Command2,Rescue5.QSL,Rescue5,we'reonthemove.QSL,Rescue5,we'reonthemove.

Rescue teams report one person trapped on the east side of the collapse, with three trauma alerts issued.

Miami PD Central Ch 3 · 0:30
Igotthat,uh,medicout.QSL.QSL,4133,I'llshowyouenroutetothe22.4390,canyourescueaCP?RescueaCP,Eastboundon14thStreetforasecond.Makesurewegetthenumbertoargue.4390.90,everybody'shere.Justmeandwasattemptingtoevict.CPwillputitrightnowfor314untiloursergeantarrives.I'mhearingtheinterior.QSL,showtheCPfor314nowandtryto225.Justre-advancingourunitstotakecaution.It'sgoingtobeonit.Justre-advancingforthepublic.73.
Miami FR Tac K · 0:31
There'sa,itlookslikehe'stalking.He'strappedupontheeastsidecollapse.That'sQSLEngine3,soyougotthreetraumaalerts.You'resayingyougotonepersontrapped?Howaretheothertwo?There'sthreetraumaalerts.IfIcangetthreestretcherscominguphere.Theothergentleman'strapped.Heappearstobecuring.He'sonaportionofthebridgethatcamedown.He'skindofjuststuckupthere.I'llletyouknow.QSL.

Police now report three or four individuals may be injured at the construction site.

Miami FR Tac K · 0:17
Commandtoincomingunits,beadvised,we'remakingourwayuptheramphereon3rdAve.Policeisadvisingwehavethreeorfourpatientsatthistime.Stillworkingourwayupthere.I'llletyouguysknow.Keepallunitsforward.

Units are advised to clear the area for fire rescue and be cautious of a leaning pillar and nails on the ground.

Miami PD Central Ch 3 · 0:31
Justhavealltheunitsclearoutofthewaysorescuecandotheirthing.That'sclear,7.Allvehiclesthatarecurrentlyblockingjusttomakewayforfirerescue,justre-advisinganyvehiclesthatareblockingjusttomakewayforfirerescueat2224,showyoucoming.4331,alsotelltheunitsthattheyneedtobecautiousbecausethepillarisleaningoverandthere'salotofnailsontheground.That'sclear,7.unitstotakecaution,justadvisethepillarontheside.you'realmostgoingtobelookingatthisside,thepillarat2220.Alright,2220,letmegetaunitinthere,I'mgoingtoneedasearch.

Rescue operations are underway, with vehicles being moved to clear access for emergency responders.

Miami PD Central Ch 3 · 0:30
QSL,we'regoingtohavethreerespondingnow,2223.QSL,one'sgoingtobehere,isgoingtobeopen.Helookslikehe'sathis30s.Wehaveonethat'sgoingtobe,it'sgoingtobehis40s.He'sresponsive,buthe'sdownaswell.Andthenwehaveanotheronethat'sgoingtobedown,that'sQSL.That'sQSL,we'lladvisenow,2223.That'sQSL.Andgoaheadandmakeamessageforengines.Idohaveanotheronethat'sresponsive,butlookslikehe'sathis40s.That'sQSL,they'rereallybeingadvisednowat2223.Isthereanymonitoring?ág
Miami PD Central Ch 3 · 0:31
Nora30,urgent.1424,Ineedthoseunitstogetthosevehiclesoutofthething.That'sQSL.41,4321,letmegettothat,please.That'sQSL,we'regoingtostartarescuenow,2220.4390,I'llshowyouincommand,4390.90,Ineedthosevehiclesmovedoutnowforrescuebecauseit'sontheoverhere.Ineedaunittolockoffthetraffic.

Additional resources are being sent to the construction site for further assessment.

Miami PD North Ch 1 · 0:18
5,Chief1,Chief2,Chief3,deltaresponse,bridgecollapse,possibleconstruction.Henry,sendthatwreckoverheretothe18Foxtrot,Big3,YankeeGolf.Goingtobegoingtobe,uh,theautopower.

First responders report no injuries found at the construction site collapse.

Miami PD Central Ch 3 · 0:30
4333,showmeenroute,23.QSL,showmeenrouteto2231U.S.15.90.QSK.Okay,soifyouhaven'tfoundanything,there'smultiple,youcanshowustheotheropeningsunderneaththe395,please.33,reference.QSK.Wemadecontactwithoneoftheconstructionguys.Oneofthepillarsthatwasperp-Wedon'tseeanybodyinjured.It'sgoingtobeintheconstructionsite.Okay.

Reports indicate the collapse involved a work bridge at the construction site.

Miami PD Central Ch 3 · 0:20
QSL,4330.QSL,4330.That'sQSL,4330.4330.Alright,what'sthereferenceonthe3?Ididn'tgetthatpart.QSL,it'safamilyatawork,collapsed.Believesthatthereisdestructionatthetop,it'sjustaworkbridge.24-11,canyourepeat?

First responders are coordinating efforts at the construction site collapse.

Miami PD Central Ch 3 · 0:15
4334,makeita315,4331,15.1490Northwest3rd.Opening.1490Northwest3rd.Disruptingtoa411.Raiseyourhandforus.2219.4331.

First responders received a 911 report of a construction site collapse.

Miami PD Central Ch 3 · 0:30
QSL,QSL,unitsin10fornow,1490NorthWest3rdAvenue.showmeinaarrival,whatunitisthat?QSL,theyadvisedfortheformerworkbridge,theycouldn'tgetfurther.QSL.1490NorthWest3rdAvenue,714.Advisingunitsin315,1490NorthWest3rdAvenue,714,2220.again?Theyadvisedfortheformerworkbridgethatcollapsed.Theadvisingunitsto1490NorthWest3rd,I'llget...

A 911 caller has reported an unconfirmed incident at 1490 NW 3rd Ave.

Stay up-to-date

Download Citizen

Comments6

MMDMNJan 17 at 12:45 AM

What's the area? There's constant construction of roadways in Miami. That poor man dying to build a roadway. God ✝️ bless him

CitizenUser494210015Jan 16 at 11:40 PM

Where is this

AmericaFuckYeahJan 17 at 12:07 AM

MCM at it again?

JoJo12345Jan 17 at 6:02 AM

@AmericaFuckYeah no. It was in downtown. At the highway construction at the interchange of 395 and I95.

miamiUser2004358009Jan 16 at 11:50 PM

Apparently something happened in the construction, there were 6 injured and 1 dead.

JoJo12345Jan 17 at 6:00 AM

@miamiUser2004358009 from everything I’ve read all were rescued and no one died.

MMDMNJan 17 at 12:45 AM

What's the area? There's constant construction of roadways in Miami. That poor man dying to build a roadway. God ✝️ bless him

CitizenUser494210015Jan 16 at 11:40 PM

Where is this

AmericaFuckYeahJan 17 at 12:07 AM

MCM at it again?

JoJo12345Jan 17 at 6:02 AM

@AmericaFuckYeah no. It was in downtown. At the highway construction at the interchange of 395 and I95.

miamiUser2004358009Jan 16 at 11:50 PM

Apparently something happened in the construction, there were 6 injured and 1 dead.

JoJo12345Jan 17 at 6:00 AM

@miamiUser2004358009 from everything I’ve read all were rescued and no one died.

MMDMNJan 17 at 12:45 AM

What's the area? There's constant construction of roadways in Miami. That poor man dying to build a roadway. God ✝️ bless him

CitizenUser494210015Jan 16 at 11:40 PM

Where is this

AmericaFuckYeahJan 17 at 12:07 AM

MCM at it again?

JoJo12345Jan 17 at 6:02 AM

@AmericaFuckYeah no. It was in downtown. At the highway construction at the interchange of 395 and I95.

miamiUser2004358009Jan 16 at 11:50 PM

Apparently something happened in the construction, there were 6 injured and 1 dead.

JoJo12345Jan 17 at 6:00 AM

@miamiUser2004358009 from everything I’ve read all were rescued and no one died.

MMDMNJan 17 at 12:45 AM

What's the area? There's constant construction of roadways in Miami. That poor man dying to build a roadway. God ✝️ bless him

CitizenUser494210015Jan 16 at 11:40 PM

Where is this

AmericaFuckYeahJan 17 at 12:07 AM

MCM at it again?

JoJo12345Jan 17 at 6:02 AM

@AmericaFuckYeah no. It was in downtown. At the highway construction at the interchange of 395 and I95.

miamiUser2004358009Jan 16 at 11:50 PM

Apparently something happened in the construction, there were 6 injured and 1 dead.

JoJo12345Jan 17 at 6:00 AM

@miamiUser2004358009 from everything I’ve read all were rescued and no one died.

MMDMNJan 17 at 12:45 AM

What's the area? There's constant construction of roadways in Miami. That poor man dying to build a roadway. God ✝️ bless him

CitizenUser494210015Jan 16 at 11:40 PM

Where is this

AmericaFuckYeahJan 17 at 12:07 AM

MCM at it again?

JoJo12345Jan 17 at 6:02 AM

@AmericaFuckYeah no. It was in downtown. At the highway construction at the interchange of 395 and I95.

miamiUser2004358009Jan 16 at 11:50 PM

Apparently something happened in the construction, there were 6 injured and 1 dead.

JoJo12345Jan 17 at 6:00 AM

@miamiUser2004358009 from everything I’ve read all were rescued and no one died.

Stay informed on local incidents

Download Citizen

Protect your world!

Download for Free